Commissioning and First Start-Up

Version 1.8 by jadomatis on 2026/08/31 08:08

Description: Learn how to bring the Schilling High-Light laser marking workstation into operation safely after installation or transport.


Only qualified personnel may commission the system. Observe all safety notes before switching on.
Important: Remove the protective cap from the laser objective before starting the laser.

Preconditions

Confirm the following before applying power:

  • All packaging material has been removed.
  • All transport locks have been removed.
  • The High-Light is standing upright in its intended operation position.
  • Supply voltage and frequency have been checked against the machine requirements.
  • The mains cable and plug are undamaged.
  • The main switch is in the OFF position before connecting the power cable.
  • The laser protection window is undamaged.
  • Optical components are free from dust and contamination.
  • The protective cover has been removed from the focusing objective.
  • All required laser-safety measures have been implemented and verified.

The operating environments must also meet the High-Light requirements:

  • Ambient temperature: +15 °C to +35 °C.
  • Relative humidity: maximum 90%, non condensing.
  • If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning.
  • Avoid shocks, vibration and other mechanical stress.
  • Keep the ventilation openings and filter areas of both 19" units unobstructed to prevent heat build-up.

Suitable extraction must be available for the mar