... ... @@ -134,31 +134,4 @@
134 134  |(% style="width:108px" %)24|(% style="width:174px" %)-|(% style="width:207px" %)Not connected
135 135  |(% style="width:108px" %)25|(% style="width:174px" %)-|(% style="width:207px" %)Not connected
136 136  
137 -
138 -
139 -= X2 Functional Grouping =
140 -
141 -(% class="table-condensed table-striped" style="width:1125px" %)
142 -|**Axis / function**|(% style="width:391px" %)**Pin(s)**|(% style="width:481px" %)**Direction stated in manual**
143 -|X axis|(% style="width:391px" %)1 Direction; 2 Step; 9 Zero|(% style="width:481px" %)Outputs on all three pins, as stated
144 -|Y axis|(% style="width:391px" %)3 Direction; 4 Step; 11 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
145 -|Z axis|(% style="width:391px" %)5 Direction; 6 Step; 13 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
146 -|R axis|(% style="width:391px" %)7 Direction; 8 Step; 15 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
147 -|Reference|(% style="width:391px" %)17 GND; 19 +5 V|(% style="width:481px" %)Outputs, as stated
148 -|Not connected|(% style="width:391px" %)10, 12, 14, 16, 18, 20-25|(% style="width:481px" %)NC
149 -
150 -
151 -
152 -= Integration and Commissioning Checks =
153 -
154 -* (((
155 -Confirm X1 is a 25-pin Sub-D socket and X2 is a 25-pin Sub-D plug before preparing mating connectors.
156 -)))
157 -* Keep safety functions, production commands, status monitoring, axis signals, and workstation connections identified separately in the electrical documentation.
158 -* Verify conductor identification, shielding, routing, protective bonding, connector retention, strain relief, and separation from interference sources for the delivered installation.
159 -* Validate both emergency-stop channels, both shutter channels, acknowledgement behaviour, guard opening, status outputs, and prevention of unexpected restart before laser operation is released.
160 -* Confirm the External START/STOP logic and LASER READY/BUSY/END sequence against the host control specification without bypassing any safety permission.
161 -* For every installed axis, verify direction, step scaling, travel limits, zero/reference behaviour, and safe motion before placing a workpiece in the marking area.
162 -* Document measured results and obtain the required approval for the complete integrated machine, not only the Auto-Light rack.
163 -
164 164