Last modified by jadomatis on 2026/09/08 08:58

From version 20.8
edited by jadomatis
on 2026/09/08 08:52
Change comment: There is no comment for this version
To version 20.9
edited by jadomatis
on 2026/09/08 08:55
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -134,4 +134,31 @@
134 134  |(% style="width:108px" %)24|(% style="width:174px" %)-|(% style="width:207px" %)Not connected
135 135  |(% style="width:108px" %)25|(% style="width:174px" %)-|(% style="width:207px" %)Not connected
136 136  
137 +
138 +
139 += X2 Functional Grouping =
140 +
141 +(% class="table-condensed table-striped" style="width:1125px" %)
142 +|**Axis / function**|(% style="width:391px" %)**Pin(s)**|(% style="width:481px" %)**Direction stated in manual**
143 +|X axis|(% style="width:391px" %)1 Direction; 2 Step; 9 Zero|(% style="width:481px" %)Outputs on all three pins, as stated
144 +|Y axis|(% style="width:391px" %)3 Direction; 4 Step; 11 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
145 +|Z axis|(% style="width:391px" %)5 Direction; 6 Step; 13 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
146 +|R axis|(% style="width:391px" %)7 Direction; 8 Step; 15 Zero|(% style="width:481px" %)Direction/Step outputs; Zero input
147 +|Reference|(% style="width:391px" %)17 GND; 19 +5 V|(% style="width:481px" %)Outputs, as stated
148 +|Not connected|(% style="width:391px" %)10, 12, 14, 16, 18, 20-25|(% style="width:481px" %)NC
149 +
150 +
151 +
152 += Integration and Commissioning Checks =
153 +
154 +* (((
155 +Confirm X1 is a 25-pin Sub-D socket and X2 is a 25-pin Sub-D plug before preparing mating connectors.
156 +)))
157 +* Keep safety functions, production commands, status monitoring, axis signals, and workstation connections identified separately in the electrical documentation.
158 +* Verify conductor identification, shielding, routing, protective bonding, connector retention, strain relief, and separation from interference sources for the delivered installation.
159 +* Validate both emergency-stop channels, both shutter channels, acknowledgement behaviour, guard opening, status outputs, and prevention of unexpected restart before laser operation is released.
160 +* Confirm the External START/STOP logic and LASER READY/BUSY/END sequence against the host control specification without bypassing any safety permission.
161 +* For every installed axis, verify direction, step scaling, travel limits, zero/reference behaviour, and safe motion before placing a workpiece in the marking area.
162 +* Document measured results and obtain the required approval for the complete integrated machine, not only the Auto-Light rack.
163 +
137 137