1 This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation.
2
3 (% class="box warningmessage" %)
4 (((
5 **Only qualified personnel may commission the system. Observe all safety notes before switching on.**
6 )))
7
8 = Preconditions (Before Switching On) =
9
10 Confirm the following before applying power:
11
12 * **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF.
13 * **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage.
14 * **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands.
15 * **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
16 * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up.
17 * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics).
18 * Operator is familiar with **laser safety** requirements; responsibilities are defined.
19 **Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices.
20
21
22
23 = Electrical Start-Up =
24
25 1. Connect the system to the specified **mains supply**. Ensure extraction is running.
26 1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.
27 1. Power on the **control PC** (or workstation) and peripherals needed for operation.
28
29
30
31 = Software and Device Connection =
32
33 1. Launch the **AnyMarker Designer **software.
34 1. Verify communication with the **laser controller** in the software (device connected, parameters readable).
35 If connection fails, switch **OFF**, check cabling and restart.
36
37 {{warning}}
38 **Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.**
39 {{/warning}}
40
41
42 = Initial Checks With Pilot Laser =
43
44 * Load or create a **test layout** in AnyMarker Designer.
45 * Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.
46
47
48
49 = Z-Axis Focusing =
50
51 1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.
52 1. Use the Z-axis adjustment to set the focus point according to the height of the marking surface. Upon delivery, the zero point is calibrated to the height of the base plate. The Z-axis moves to the correct point according to the parameters of the workpiece. Check the focus point and adjust if necessary.
53 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
54
55
56
57 = Parameter Verification =
58
59 * Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
60 * Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking.
61
62
63
64 = First Test Mark =
65
66 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material.
67 1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk.
68 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming.
69
70
71
72 = Post-Test Verification =
73
74 * Inspect the mark; check legibility/contrast. Clean light residue if necessary.
75 * Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate.
76 * Document the **approved parameter set** for production.
77
78
79
80 = Normal Operation Handover =
81
82 * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage.
83 * Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).
84
85
86
87 = Shutdown (End of Day) =
88
89 1. Stop software and close the project.
90 1. Turn the system **OFF **via main switch; power down extraction as specified.
91 1. Clean the work area; never leave the machine **unattended **while powered.