Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Parent
-
... ... @@ -1,1 +1,1 @@ 1 -Laser Marking Machines.Getting Started.WebHome 1 +Laser Marking Machines.Schilling Marking Systems Multi-Light.Getting Started.WebHome - Content
-
... ... @@ -1,55 +8,44 @@ 1 -This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. 2 - 3 -(% class="box warningmessage" %) 4 -((( 5 -**Only qualified personnel may commission the system. Observe all safety notes before switching on.** 6 -))) 7 - 8 8 = Preconditions (Before Switching On) = 9 9 10 10 Confirm the following before applying power: 11 11 12 -* **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF. 13 -* **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage. 14 -* **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands. 15 -* **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 16 -* **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up. 17 -* **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics). 18 -* Operator is familiar with **laser safety** requirements; responsibilities are defined. 19 -**Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices. 5 +* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF. 6 +* Protective housing and door interlocks are intact; laser viewing window shows now damage. 7 +* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands. 8 +* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 9 +* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up. 10 +* Operator is familiar with laser safety requirements; responsibilities are defined. 11 +Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices. 20 20 21 21 22 22 23 23 = Electrical Start-Up = 24 24 25 -1. Connect the system to the specified **mains supply**. Ensure extraction is running.26 -1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.27 -1. Power on the **control PC**(or workstation) and peripherals needed for operation.17 +1. Connect the system to the specified mains supply. Ensure extraction is running. 18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 +1. Power on the control PC (or workstation) and peripherals needed for operation. 28 28 29 29 30 30 31 31 = Software and Device Connection = 32 32 33 -1. Launch the **AnyMarker Designer**software.34 -1. Verify communication with the **laser controller**in the software (device connected, parameters readable).35 -If connection fails, switch **OFF**, check cabling and restart.25 +1. Launch the AnyMarker Designer software. 26 +1. Verify communication with the laser controller in the software (device connected, parameters readable). 27 +If connection fails, switch OFF, check cabling and restart. 36 36 37 -{{warning}} 38 -**Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.** 39 -{{/warning}} 40 40 41 41 42 42 = Initial Checks With Pilot Laser = 43 43 44 -* Load or create a **test layout**in AnyMarker Designer.45 -* Enable the **pilot laser**to project contours on the workpiece; verify**orientation and placement**without laser emission. Keep the door closed.33 +* Load or create a test layout in AnyMarker Designer. 34 +* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed. 46 46 47 47 48 48 49 49 = Z-Axis Focusing = 50 50 51 -1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.52 -1. Use the Z-axis adjustment to setthefocuspointaccordingto theheight of the markingsurface.Upon delivery,thezero point is calibratedto the heightof the baseplate.The Z-axis moves to thecorrect point according totheparametersofthe workpiece.Check thefocus pointandadjust if necessary.40 +1. Place the workpiece/fixture in the work chamber and close the manual lift door. 41 +1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 53 53 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. 54 54 55 55 ... ... @@ -56,40 +56,4 @@ 56 56 57 57 = Parameter Verification = 58 58 59 -* Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 60 -* Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking. 61 - 62 - 63 - 64 -= First Test Mark = 65 - 66 -1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material. 67 -1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk. 68 -1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming. 69 - 70 - 71 - 72 -= Post-Test Verification = 73 - 74 -* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 75 -* Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate. 76 -* Document the **approved parameter set** for production. 77 - 78 - 79 - 80 -= Normal Operation Handover = 81 - 82 -* Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage. 83 -* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional). 84 - 85 - 86 - 87 -= Shutdown (End of Day) = 88 - 89 -1. Stop software and close the project. 90 -1. Turn the system **OFF **via main switch; power down extraction as specified. 91 -1. Clean the work area; never leave the machine **unattended **while powered. 92 - 93 - 94 - 95 - 48 +* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to a