Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -29,12 +29,15 @@ 29 29 1. Verify communication with the **laser controller** in the software (device connected, parameters readable). 30 30 If connection fails, switch **OFF**, check cabling and restart. 31 31 32 +{{warning}} 33 +**Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.** 34 +{{/warning}} 32 32 33 33 34 34 = Initial Checks With Pilot Laser = 35 35 36 36 * Load or create a **test layout** in AnyMarker Designer. 37 -* Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.40 +* Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed. 38 38 39 39 40 40 ... ... @@ -72,7 +72,7 @@ 72 72 = Normal Operation Handover = 73 73 74 74 * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage. 75 -* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).78 +* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional). 76 76 77 77 78 78