Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,10 +1,5 @@ 1 -This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. 1 +This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on. 2 2 3 -(% class="box warningmessage" %) 4 -((( 5 -**Only qualified personnel may commission the system. Observe all safety notes before switching on.** 6 -))) 7 - 8 8 = Preconditions (Before Switching On) = 9 9 10 10 Confirm the following before applying power: ... ... @@ -64,7 +64,7 @@ 64 64 = First Test Mark = 65 65 66 66 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material. 67 -1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk.62 +1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature to reduce fire risk. 68 68 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming. 69 69 70 70