Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,4 +1,4 @@ 1 -This procedure describes how to bring the Multi-Light or Multi-Light PLUSworkstationsinto operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on.1 +This procedure describes how to bring the Multi-Light workstation into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on. 2 2 3 3 = Preconditions (Before Switching On) = 4 4 ... ... @@ -11,7 +11,7 @@ 11 11 * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up. 12 12 * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics). 13 13 * Operator is familiar with **laser safety** requirements; responsibilities are defined. 14 -**Note**: The Multi-Light and Multi-Light PLUS bothcontain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices.14 +**Note**: The Multi-Light contains a **Class 4 **source operated as **Class 1** in the closed cabin. Never bypass safety devices. 15 15 16 16 17 17