1 -This procedure describes how to bring the Multi-Light workstation into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on.
2 -
3 3  = Preconditions (Before Switching On) =
4 4  
5 5  Confirm the following before applying power:
6 6  
7 -* **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF.
8 -* **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage.
9 -* **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands.
10 -* **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
11 -* **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up.
12 -* **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics).
13 -* Operator is familiar with **laser safety** requirements; responsibilities are defined.
14 -**Note**: The Multi-Light contains a **Class 4 **source operated as **Class 1** in the closed cabin. Never bypass safety devices.
5 +* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF.
6 +* Protective housing and door interlocks are intact; laser viewing window shows now damage.
7 +* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands.
8 +* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
9 +* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up.
10 +* Operator is familiar with laser safety requirements; responsibilities are defined.
11 +Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices.
15 15  
16 16  
17 17  
18 18  = Electrical Start-Up =
19 19  
20 -1. Connect the system to the specified **mains supply**. Ensure extraction is running.
21 -1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.
22 -1. Power on the **control PC** (or workstation) and peripherals needed for operation.
17 +1. Connect the system to the specified mains supply. Ensure extraction is running.
18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel.
19 +1. Power on the control PC (or workstation) and peripherals needed for operation.
23 23  
24 24  
25 25  
26 26  = Software and Device Connection =
27 27  
28 -1. Launch the **AnyMarker Designer **software.
29 -1. Verify communication with the **laser controller** in the software (device connected, parameters readable).
30 -If connection fails, switch **OFF**, check cabling and restart.
25 +1. Launch the AnyMarker Designer software.
26 +1. Verify communication with the laser controller in the software (device connected, parameters readable).
27 +If connection fails, switch OFF, check cabling and restart.
31 31  
32 32  
33 33  
34 34  = Initial Checks With Pilot Laser =
35 35  
36 -* Load or create a **test layout** in AnyMarker Designer.
37 -* Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.
33 +* Load or create a test layout in AnyMarker Designer.
34 +* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed.
38 38  
39 39  
40 40  
41 41  = Z-Axis Focusing =
42 42  
43 -1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.
44 -1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
40 +1. Place the workpiece/fixture in the work chamber and close the manual lift door.
41 +1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
45 45  1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
46 46  
47 47  
48 48  
49 -= Parameter Verification =
50 -
51 -* Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
52 -* Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking.
53 -
54 -
55 -
56 -= First Test Mark =
57 -
58 -1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material.
59 -1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature to reduce fire risk.
60 -1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming.
61 -
62 -
63 -
64 -= Post-Test Verification =
65 -
66 -* Inspect the mark; check legibility/contrast. Clean light residue if necessary.
67 -* Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate.
68 -* Document the **approved parameter set** for production.
69 -
70 -
71 -
72 -= Normal Operation Handover =
73 -
74 -* Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage.
75 -* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).
76 -
77 -
78 -
79 -= Shutdown (End of Day) =
80 -
81 -1. Stop software and close the project.
82 -1. Turn the system **OFF **via main switch; power down extraction as specified.
83 -1. Clean the work area; never leave the machine **unattended **while powered.
84 -
85 -
86 -