Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -12,4 +12,35 @@ 12 12 13 13 14 14 15 += Electrical Start-Up = 16 + 17 +1. Connect the system to the specified mains supply. Ensure extraction is running. 18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 +1. Power on the control PC (or workstation) and peripherals needed for operation. 20 + 21 + 22 + 23 += Software and Device Connection = 24 + 25 +1. Launch the AnyMarker Designer software. 26 +1. Verify communication with the laser controller in the software (device connected, parameters readable). 27 +If connection fails, switch OFF, check cabling and restart. 28 + 29 + 30 + 31 += Initial Checks With Pilot Laser = 32 + 33 +* Load or create a test layout in AnyMarker Designer. 34 +* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed. 35 + 36 + 37 + 38 += Z-Axis Focusing = 39 + 40 +1. Place the workpiece/fixture in the work chamber and close the manual lift door. 41 +1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 42 +1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. 43 + 44 + 45 + 15 15