Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -8,4 +8,69 @@ 8 8 * Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 9 9 * Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up. 10 10 * Operator is familiar with laser safety requirements; responsibilities are defined. 11 -Note: The Multi-Light containe 11 +Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices. 12 + 13 + 14 + 15 += Electrical Start-Up = 16 + 17 +1. Connect the system to the specified mains supply. Ensure extraction is running. 18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 +1. Power on the control PC (or workstation) and peripherals needed for operation. 20 + 21 + 22 + 23 += Software and Device Connection = 24 + 25 +1. Launch the AnyMarker Designer software. 26 +1. Verify communication with the laser controller in the software (device connected, parameters readable). 27 +If connection fails, switch OFF, check cabling and restart. 28 + 29 + 30 + 31 += Initial Checks With Pilot Laser = 32 + 33 +* Load or create a test layout in AnyMarker Designer. 34 +* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed. 35 + 36 + 37 + 38 += Z-Axis Focusing = 39 + 40 +1. Place the workpiece/fixture in the work chamber and close the manual lift door. 41 +1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 42 +1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. 43 + 44 + 45 + 46 += Parameter Verification = 47 + 48 +* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 49 +* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking. 50 + 51 + 52 + 53 += First Test Mark = 54 + 55 +1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 +1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 +1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 58 + 59 + 60 + 61 += Post-Test Verification = 62 + 63 +* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 +* Document the approved parameter set for production. 66 + 67 + 68 + 69 += Normal Operation Handover = 70 + 71 +* Train operators on door interlock, pilot laser, start/stop, and notifications usage. 72 +* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional). 73 + 74 + 75 + 76 +