Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -15,66 +15,4 @@ 15 15 = Electrical Start-Up = 16 16 17 17 1. Connect the system to the specified mains supply. Ensure extraction is running. 18 -1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 -1. Power on the control PC (or workstation) and peripherals needed for operation. 20 - 21 - 22 - 23 -= Software and Device Connection = 24 - 25 -1. Launch the AnyMarker Designer software. 26 -1. Verify communication with the laser controller in the software (device connected, parameters readable). 27 -If connection fails, switch OFF, check cabling and restart. 28 - 29 - 30 - 31 -= Initial Checks With Pilot Laser = 32 - 33 -* Load or create a test layout in AnyMarker Designer. 34 -* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed. 35 - 36 - 37 - 38 -= Z-Axis Focusing = 39 - 40 -1. Place the workpiece/fixture in the work chamber and close the manual lift door. 41 -1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 42 -1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. 43 - 44 - 45 - 46 -= Parameter Verification = 47 - 48 -* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 49 -* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking. 50 - 51 - 52 - 53 -= First Test Mark = 54 - 55 -1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 -1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 -1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 58 - 59 - 60 - 61 -= Post-Test Verification = 62 - 63 -* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 -* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 -* Document the approved parameter set for production. 66 - 67 - 68 - 69 -= Normal Operation Handover = 70 - 71 -* Train operators on door interlock, pilot laser, start/stop, and notifications usage. 72 -* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional). 73 - 74 - 75 - 76 -= Shutdown (End of Day) = 77 - 78 -1. Stop software and close the project. 79 -1. Turn the system OFF via main switch; power down extraction as specified. 80 -1. Clean the work 18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as