Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,44 +1,50 @@ 1 +This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on. 2 + 1 1 = Preconditions (Before Switching On) = 2 2 3 3 Confirm the following before applying power: 4 4 5 -* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF. 6 -* Protective housing and door interlocks are intact; laser viewing window shows now damage. 7 -* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands. 8 -* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 9 -* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up. 10 -* Operator is familiar with laser safety requirements; responsibilities are defined. 11 -Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices. 7 +* **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF. 8 +* **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage. 9 +* **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands. 10 +* **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 11 +* **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up. 12 +* **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics). 13 +* Operator is familiar with **laser safety** requirements; responsibilities are defined. 14 +**Note**: The Multi-Light contains a **Class 4 **source operated as **Class 1** in the closed cabin. Never bypass safety devices. 12 12 13 13 14 14 15 15 = Electrical Start-Up = 16 16 17 -1. Connect the system to the specified mains supply. Ensure extraction is running. 18 -1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 -1. Power on the control PC (or workstation) and peripherals needed for operation. 20 +1. Connect the system to the specified **mains supply**. Ensure extraction is running. 21 +1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel. 22 +1. Power on the **control PC** (or workstation) and peripherals needed for operation. 20 20 21 21 22 22 23 23 = Software and Device Connection = 24 24 25 -1. Launch the AnyMarker Designer software. 26 -1. Verify communication with the laser controller in the software (device connected, parameters readable). 27 -If connection fails, switch OFF, check cabling and restart. 28 +1. Launch the **AnyMarker Designer **software. 29 +1. Verify communication with the **laser controller** in the software (device connected, parameters readable). 30 +If connection fails, switch **OFF**, check cabling and restart. 28 28 32 +{{warning}} 33 +**Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.** 34 +{{/warning}} 29 29 30 30 31 31 = Initial Checks With Pilot Laser = 32 32 33 -* Load or create a test layout in AnyMarker Designer. 34 -* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed.39 +* Load or create a **test layout** in AnyMarker Designer. 40 +* Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed. 35 35 36 36 37 37 38 38 = Z-Axis Focusing = 39 39 40 -1. Place the workpiece/fixture in the work chamber and close the manual lift door. 41 -1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 46 +1. Place the workpiece/fixture in the work chamber and close the **manual lift door**. 47 +1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. 42 42 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. 43 43 44 44 ... ... @@ -45,16 +45,16 @@ 45 45 46 46 = Parameter Verification = 47 47 48 -* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 49 -* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking. 54 +* Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 55 +* Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking. 50 50 51 51 52 52 53 53 = First Test Mark = 54 54 55 -1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 -1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 -1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 61 +1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material. 62 +1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature to reduce fire risk. 63 +1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming. 58 58 59 59 60 60 ... ... @@ -61,16 +61,24 @@ 61 61 = Post-Test Verification = 62 62 63 63 * Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 -* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 -* Document the approved parameter set for production. 70 +* Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate. 71 +* Document the **approved parameter set** for production. 66 66 67 67 68 68 69 69 = Normal Operation Handover = 70 70 71 -* Train operators on door interlock, pilot laser, start/stop, and notifications usage. 72 -* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional).77 +* Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage. 78 +* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional). 73 73 74 74 75 75 82 += Shutdown (End of Day) = 83 + 84 +1. Stop software and close the project. 85 +1. Turn the system **OFF **via main switch; power down extraction as specified. 86 +1. Clean the work area; never leave the machine **unattended **while powered. 87 + 88 + 89 + 76 76