Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -51,26 +51,3 @@ 51 51 52 52 53 53 = First Test Mark = 54 - 55 -1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 -1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 -1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 58 - 59 - 60 - 61 -= Post-Test Verification = 62 - 63 -* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 -* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 -* Document the approved parameter set for production. 66 - 67 - 68 - 69 -= Normal Operation Handover = 70 - 71 -* Train operators on door interlock, pilot laser, start/stop, and notifications usage. 72 -* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional). 73 - 74 - 75 - 76 -