Last modified by jadomatis on 2025/10/08 11:08

From version 1.24
edited by jadomatis
on 2025/09/29 14:10
Change comment: There is no comment for this version
To version 1.16
edited by jadomatis
on 2025/09/29 13:08
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -43,34 +43,4 @@
43 43  
44 44  
45 45  
46 -= Parameter Verification =
47 -
48 -* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
49 -* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking.
50 -
51 -
52 -
53 -= First Test Mark =
54 -
55 -1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material.
56 -1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk.
57 -1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming.
58 -
59 -
60 -
61 -= Post-Test Verification =
62 -
63 -* Inspect the mark; check legibility/contrast. Clean light residue if necessary.
64 -* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate.
65 -* Document the approved parameter set for production.
66 -
67 -
68 -
69 -= Normal Operation Handover =
70 -
71 -* Train operators on door interlock, pilot laser, start/stop, and notifications usage.
72 -* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional).
73 -
74 -
75 -
76 76