Last modified by jadomatis on 2025/10/08 11:08

From version 1.22
edited by jadomatis
on 2025/09/29 14:07
Change comment: There is no comment for this version
To version 3.1
edited by jadomatis
on 2025/10/01 07:09
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,44 +1,50 @@
1 +This procedure describes how to bring the Multi-Light workstation into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on.
2 +
1 1  = Preconditions (Before Switching On) =
2 2  
3 3  Confirm the following before applying power:
4 4  
5 -* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF.
6 -* Protective housing and door interlocks are intact; laser viewing window shows now damage.
7 -* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands.
8 -* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
9 -* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up.
10 -* Operator is familiar with laser safety requirements; responsibilities are defined.
11 -Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices.
7 +* **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF.
8 +* **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage.
9 +* **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands.
10 +* **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
11 +* **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up.
12 +* **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics).
13 +* Operator is familiar with **laser safety** requirements; responsibilities are defined.
14 +**Note**: The Multi-Light contains a **Class 4 **source operated as **Class 1** in the closed cabin. Never bypass safety devices.
12 12  
13 13  
14 14  
15 15  = Electrical Start-Up =
16 16  
17 -1. Connect the system to the specified mains supply. Ensure extraction is running.
18 -1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel.
19 -1. Power on the control PC (or workstation) and peripherals needed for operation.
20 +1. Connect the system to the specified **mains supply**. Ensure extraction is running.
21 +1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.
22 +1. Power on the **control PC** (or workstation) and peripherals needed for operation.
20 20  
21 21  
22 22  
23 23  = Software and Device Connection =
24 24  
25 -1. Launch the AnyMarker Designer software.
26 -1. Verify communication with the laser controller in the software (device connected, parameters readable).
27 -If connection fails, switch OFF, check cabling and restart.
28 +1. Launch the **AnyMarker Designer **software.
29 +1. Verify communication with the **laser controller** in the software (device connected, parameters readable).
30 +If connection fails, switch **OFF**, check cabling and restart.
28 28  
32 +{{warning}}
33 +**Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.**
34 +{{/warning}}
29 29  
30 30  
31 31  = Initial Checks With Pilot Laser =
32 32  
33 -* Load or create a test layout in AnyMarker Designer.
34 -* Enable the pilot laser to project contours on the workpiece; verify orientation and placement without laser emission. Keep the door closed.
39 +* Load or create a **test layout** in AnyMarker Designer.
40 +* Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.
35 35  
36 36  
37 37  
38 38  = Z-Axis Focusing =
39 39  
40 -1. Place the workpiece/fixture in the work chamber and close the manual lift door.
41 -1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
46 +1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.
47 +1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
42 42  1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
43 43  
44 44  
... ... @@ -45,16 +45,16 @@
45 45  
46 46  = Parameter Verification =
47 47  
48 -* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
49 -* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking.
54 +* Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
55 +* Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking.
50 50  
51 51  
52 52  
53 53  = First Test Mark =
54 54  
55 -1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material.
56 -1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk.
57 -1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming.
61 +1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material.
62 +1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature to reduce fire risk.
63 +1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming.
58 58  
59 59  
60 60  
... ... @@ -61,4 +61,24 @@
61 61  = Post-Test Verification =
62 62  
63 63  * Inspect the mark; check legibility/contrast. Clean light residue if necessary.
64 -* Re-check filters/airflow after
70 +* Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate.
71 +* Document the **approved parameter set** for production.
72 +
73 +
74 +
75 += Normal Operation Handover =
76 +
77 +* Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage.
78 +* Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).
79 +
80 +
81 +
82 += Shutdown (End of Day) =
83 +
84 +1. Stop software and close the project.
85 +1. Turn the system **OFF **via main switch; power down extraction as specified.
86 +1. Clean the work area; never leave the machine **unattended **while powered.
87 +
88 +
89 +
90 +