... ... @@ -61,4 +61,20 @@
61 61  = Post-Test Verification =
62 62  
63 63  * Inspect the mark; check legibility/contrast. Clean light residue if necessary.
64 -* Re-check filters/airflow after
64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate.
65 +* Document the approved parameter set for production.
66 +
67 +
68 +
69 += Normal Operation Handover =
70 +
71 +* Train operators on door interlock, pilot laser, start/stop, and notifications usage.
72 +* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional).
73 +
74 +
75 +
76 += Shutdown (End of Day) =
77 +
78 +1. Stop software and close the project.
79 +1. Turn the system OFF via main switch; power down extraction as specified.
80 +1. Clean the work