Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -58,4 +58,23 @@ 58 58 59 59 60 60 61 - 61 += Post-Test Verification = 62 + 63 +* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 +* Document the approved parameter set for production. 66 + 67 + 68 + 69 += Normal Operation Handover = 70 + 71 +* Train operators on door interlock, pilot laser, start/stop, and notifications usage. 72 +* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional). 73 + 74 + 75 + 76 += Shutdown (End of Day) = 77 + 78 +1. Stop software and close the project. 79 +1. Turn the system OFF via main switch; power down extraction as specified. 80 +1. Clean the work