Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -53,4 +53,19 @@ 53 53 = First Test Mark = 54 54 55 55 1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 -1. Observe quality and adjust paramete 56 +1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 +1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 58 + 59 + 60 + 61 += Post-Test Verification = 62 + 63 +* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 +* Document the approved parameter set for production. 66 + 67 + 68 + 69 += Normal Operation Handover = 70 + 71 +* Train operators on door interl