Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -43,4 +43,29 @@ 43 43 44 44 45 45 46 - 46 += Parameter Verification = 47 + 48 +* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. 49 +* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking. 50 + 51 + 52 + 53 += First Test Mark = 54 + 55 +1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material. 56 +1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk. 57 +1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming. 58 + 59 + 60 + 61 += Post-Test Verification = 62 + 63 +* Inspect the mark; check legibility/contrast. Clean light residue if necessary. 64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate. 65 +* Document the approved parameter set for production. 66 + 67 + 68 + 69 += Normal Operation Handover = 70 + 71 +* Train operators on door interl