Last modified by jadomatis on 2025/10/08 11:08

From version 1.15
edited by jadomatis
on 2025/09/29 13:06
Change comment: There is no comment for this version
To version 1.25
edited by jadomatis
on 2025/09/29 14:30
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -38,4 +38,43 @@
38 38  = Z-Axis Focusing =
39 39  
40 40  1. Place the workpiece/fixture in the work chamber and close the manual lift door.
41 -1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow
41 +1. Use the automatic Z-axis to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
42 +1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
43 +
44 +
45 +
46 += Parameter Verification =
47 +
48 +* Select a verified marking parameter set (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
49 +* Ensure extraction is active to remove gases, vapors, aerosols, and dust during test marking.
50 +
51 +
52 +
53 += First Test Mark =
54 +
55 +1. With the cabin closed and interlocks engaged, execute a short test mark on a sample of the target material.
56 +1. Observe quality and adjust parameters (e.g., reduce power/increase speed) as needed. Multiple repetitions may be used for depth, but monitor temperature to reduce fire risk.
57 +1. If unexpected behavior occurs, press STOP/EMERGENCY-STOP, investigate messages in Notifications, and correct the cause before resuming.
58 +
59 +
60 +
61 += Post-Test Verification =
62 +
63 +* Inspect the mark; check legibility/contrast. Clean light residue if necessary.
64 +* Re-check filters/airflow after prolonged tests. Excess dust must not accumulate.
65 +* Document the approved parameter set for production.
66 +
67 +
68 +
69 += Normal Operation Handover =
70 +
71 +* Train operators on door interlock, pilot laser, start/stop, and notifications usage.
72 +* Emphasize daily pre-shift checks (visible damage, labels present, safety devices functional).
73 +
74 +
75 +
76 += Shutdown (End of Day) =
77 +
78 +1. Stop software and close the project.
79 +1. Turn the system OFF via main switch; power down extraction as specified.
80 +1. Clean the work