... ... @@ -15,11 +15,4 @@
15 15  = Electrical Start-Up =
16 16  
17 17  1. Connect the system to the specified mains supply. Ensure extraction is running.
18 -1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel.
19 -1. Power on the control PC (or workstation) and peripherals needed for operation.
20 -
21 -
22 -
23 -= Software and Device Connection =
24 -
25 -1. Launch the AnyMarker Dwai
18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel