Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -2,22 +2,4 @@ 2 2 3 3 Confirm the following before applying power: 4 4 5 -* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF. 6 -* Protective housing and door interlocks are intact; laser viewing window shows now damage. 7 -* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands. 8 -* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 9 -* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up. 10 -* Operator is familiar with laser safety requirements; responsibilities are defined. 11 -Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices. 12 - 13 - 14 - 15 -= Electrical Start-Up = 16 - 17 -1. Connect the system to the specified mains supply. Ensure extraction is running. 18 -1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel. 19 -1. Power on the control PC (or workstation) and peripherals needed for operation. 20 - 21 - 22 - 23 - 5 +* Electrical