Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2025/10/08 11:08
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -2,4 +2,17 @@ 2 2 3 3 Confirm the following before applying power: 4 4 5 -* 5 +* Electrical installation is correct; mains voltage and frequency match the rating place. Main switch is OFF. 6 +* Protective housing and door interlocks are intact; laser viewing window shows now damage. 7 +* Optics are clean; remove any transport/lens cover only now. Avoid touching optics with bare hands. 8 +* Ambient conditions: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. 9 +* Airflow at 19" drawers is unobstructed; filter mats are clean to prevent heat build-up. 10 +* Operator is familiar with laser safety requirements; responsibilities are defined. 11 +Note: The Multi-Light contains a Class 4 source operated as Class 1 in the closed cabin. Never bypass safety devices. 12 + 13 + 14 + 15 += Electrical Start-Up = 16 + 17 +1. Connect the system to the specified mains supply. Ensure extraction is running. 18 +1. Set the mains switch to ON. Internal electronics initialize; status indicators light as described on the operator panel