5.1 | 1 | This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. |
| |
2.1 | 2 | |
| |
5.1 | 3 | (% class="box warningmessage" %) |
| 4 | ((( | ||
| 5 | **Only qualified personnel may commission the system. Observe all safety notes before switching on.** | ||
| 6 | ))) | ||
| 7 | |||
| |
1.1 | 8 | = Preconditions (Before Switching On) = |
| 9 | |||
| 10 | Confirm the following before applying power: | ||
| 11 | |||
| |
2.1 | 12 | * **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF. |
| 13 | * **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage. | ||
| 14 | * **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands. | ||
| 15 | * **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. | ||
| 16 | * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up. | ||
| 17 | * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics). | ||
| 18 | * Operator is familiar with **laser safety** requirements; responsibilities are defined. | ||
| |
3.3 | 19 | **Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices. |
| |
1.7 | 20 | |
| 21 | |||
| 22 | |||
| |
1.8 | 23 | = Electrical Start-Up = |
| 24 | |||
| |
2.1 | 25 | 1. Connect the system to the specified **mains supply**. Ensure extraction is running. |
| 26 | 1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel. | ||
| 27 | 1. Power on the **control PC** (or workstation) and peripherals needed for operation. | ||
| |
1.10 | 28 | |
| 29 | |||
| 30 | |||
| |
1.11 | 31 | = Software and Device Connection = |
| 32 | |||
| |
2.1 | 33 | 1. Launch the **AnyMarker Designer **software. |
| 34 | 1. Verify communication with the **laser controller** in the software (device connected, parameters readable). | ||
| 35 | If connection fails, switch **OFF**, check cabling and restart. | ||
| |
1.12 | 36 | |
| |
3.1 | 37 | {{warning}} |
| 38 | **Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.** | ||
| 39 | {{/warning}} | ||
| |
1.12 | 40 | |
| 41 | |||
| |
1.13 | 42 | = Initial Checks With Pilot Laser = |
| 43 | |||
| |
2.1 | 44 | * Load or create a **test layout** in AnyMarker Designer. |
| |
3.1 | 45 | * Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed. |
| |
1.14 | 46 | |
| 47 | |||
| 48 | |||
| |
1.15 | 49 | = Z-Axis Focusing = |
| 50 | |||
| |
2.1 | 51 | 1. Place the workpiece/fixture in the work chamber and close the **manual lift door**. |
| |
7.1 | 52 | 1. Use the Z-axis adjustment to set the focus point according to the height of the marking surface. Upon delivery, the zero point is calibrated to the height of the base plate. The Z-axis moves to the correct point according to the parameters of the workpiece. Check the focus point and adjust if necessary. |
| |
1.16 | 53 | 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. |
| 54 | |||
| 55 | |||
| 56 | |||
| |
1.17 | 57 | = Parameter Verification = |
| 58 | |||
| |
2.1 | 59 | * Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. |
| 60 | * Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking. | ||
| |
1.18 | 61 | |
| 62 | |||
| 63 | |||
| |
1.19 | 64 | = First Test Mark = |
| |
1.20 | 65 | |
| |
2.1 | 66 | 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material. |
| |
6.1 | 67 | 1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk. |
| |
2.1 | 68 | 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming. |
| |
1.21 | 69 | |
| 70 | |||
| 71 | |||
| |
1.22 | 72 | = Post-Test Verification = |
| 73 | |||
| 74 | * Inspect the mark; check legibility/contrast. Clean light residue if necessary. | ||
| |
2.1 | 75 | * Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate. |
| 76 | * Document the **approved parameter set** for production. | ||
| |
1.23 | 77 | |
| 78 | |||
| 79 | |||
| 80 | = Normal Operation Handover = | ||
| 81 | |||
| |
2.1 | 82 | * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage. |
| |
3.1 | 83 | * Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional). |
| |
1.24 | 84 | |
| 85 | |||
| 86 | |||
| |
1.25 | 87 | = Shutdown (End of Day) = |
| 88 | |||
| 89 | 1. Stop software and close the project. | ||
| |
2.1 | 90 | 1. Turn the system **OFF **via main switch; power down extraction as specified. |
| 91 | 1. Clean the work area; never leave the machine **unattended **while powered. | ||