Wiki source code of Commissioning and First Start-Up
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. | ||
| 2 | |||
| 3 | (% class="box warningmessage" %) | ||
| 4 | ((( | ||
| 5 | **Only qualified personnel may commission the system. Observe all safety notes before switching on.** | ||
| 6 | ))) | ||
| 7 | |||
| 8 | = Preconditions (Before Switching On) = | ||
| 9 | |||
| 10 | Confirm the following before applying power: | ||
| 11 | |||
| 12 | * **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF. | ||
| 13 | * **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage. | ||
| 14 | * **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands. | ||
| 15 | * **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport. | ||
| 16 | * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up. | ||
| 17 | * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics). | ||
| 18 | * Operator is familiar with **laser safety** requirements; responsibilities are defined. | ||
| 19 | **Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices. | ||
| 20 | |||
| 21 | |||
| 22 | |||
| 23 | = Electrical Start-Up = | ||
| 24 | |||
| 25 | 1. Connect the system to the specified **mains supply**. Ensure extraction is running. | ||
| 26 | 1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel. | ||
| 27 | 1. Power on the **control PC** (or workstation) and peripherals needed for operation. | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | = Software and Device Connection = | ||
| 32 | |||
| 33 | 1. Launch the **AnyMarker Designer **software. | ||
| 34 | 1. Verify communication with the **laser controller** in the software (device connected, parameters readable). | ||
| 35 | If connection fails, switch **OFF**, check cabling and restart. | ||
| 36 | |||
| 37 | {{warning}} | ||
| 38 | **Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.** | ||
| 39 | {{/warning}} | ||
| 40 | |||
| 41 | |||
| 42 | = Initial Checks With Pilot Laser = | ||
| 43 | |||
| 44 | * Load or create a **test layout** in AnyMarker Designer. | ||
| 45 | * Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed. | ||
| 46 | |||
| 47 | |||
| 48 | |||
| 49 | = Z-Axis Focusing = | ||
| 50 | |||
| 51 | 1. Place the workpiece/fixture in the work chamber and close the **manual lift door**. | ||
| 52 | 1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height. | ||
| 53 | 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual. | ||
| 54 | |||
| 55 | |||
| 56 | |||
| 57 | = Parameter Verification = | ||
| 58 | |||
| 59 | * Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare. | ||
| 60 | * Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking. | ||
| 61 | |||
| 62 | |||
| 63 | |||
| 64 | = First Test Mark = | ||
| 65 | |||
| 66 | 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material. | ||
| 67 | 1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk. | ||
| 68 | 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming. | ||
| 69 | |||
| 70 | |||
| 71 | |||
| 72 | = Post-Test Verification = | ||
| 73 | |||
| 74 | * Inspect the mark; check legibility/contrast. Clean light residue if necessary. | ||
| 75 | * Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate. | ||
| 76 | * Document the **approved parameter set** for production. | ||
| 77 | |||
| 78 | |||
| 79 | |||
| 80 | = Normal Operation Handover = | ||
| 81 | |||
| 82 | * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage. | ||
| 83 | * Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional). | ||
| 84 | |||
| 85 | |||
| 86 | |||
| 87 | = Shutdown (End of Day) = | ||
| 88 | |||
| 89 | 1. Stop software and close the project. | ||
| 90 | 1. Turn the system **OFF **via main switch; power down extraction as specified. | ||
| 91 | 1. Clean the work area; never leave the machine **unattended **while powered. | ||
| 92 | |||
| 93 | |||
| 94 | |||
| 95 |