1 This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation.
2
3 (% class="box warningmessage" %)
4 (((
5 **Only qualified personnel may commission the system. Observe all safety notes before switching on.**
6 )))
7
8 = Preconditions (Before Switching On) =
9
10 Confirm the following before applying power:
11
12 * **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF.
13 * **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage.
14 * **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands.
15 * **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
16 * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up.
17 * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics).
18 * Operator is familiar with **laser safety** requirements; responsibilities are defined.
19 **Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices.
20
21
22
23 = Electrical Start-Up =
24
25 1. Connect the system to the specified **mains supply**. Ensure extraction is running.
26 1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.
27 1. Power on the **control PC** (or workstation) and peripherals needed for operation.
28
29
30
31 = Software and Device Connection =
32
33 1. Launch the **AnyMarker Designer **software.
34 1. Verify communication with the **laser controller** in the software (device connected, parameters readable).
35 If connection fails, switch **OFF**, check cabling and restart.
36
37 {{warning}}
38 **Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.**
39 {{/warning}}
40
41
42 = Initial Checks With Pilot Laser =
43
44 * Load or create a **test layout** in AnyMarker Designer.
45 * Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.
46
47
48
49 = Z-Axis Focusing =
50
51 1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.
52 1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
53 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
54
55
56
57 = Parameter Verification =
58
59 * Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
60 * Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking.
61
62
63
64 = First Test Mark =
65
66 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material.
67 1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature with a suitable temperature reading device to reduce fire risk.
68 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming.
69
70
71
72 = Post-Test Verification =
73
74 * Inspect the mark; check legibility/contrast. Clean light residue if necessary.
75 * Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate.
76 * Document the **approved parameter set** for production.
77
78
79
80 = Normal Operation Handover =
81
82 * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage.
83 * Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).
84
85
86
87 = Shutdown (End of Day) =
88
89 1. Stop software and close the project.
90 1. Turn the system **OFF **via main switch; power down extraction as specified.
91 1. Clean the work area; never leave the machine **unattended **while powered.