1 This procedure describes how to bring the Multi-Light or Multi-Light PLUS workstations into operation safely after transport or installation. **Only qualified personnel **may commission the system. Observer all safety notes before switching on.
2
3 = Preconditions (Before Switching On) =
4
5 Confirm the following before applying power:
6
7 * **Electrical installation is correct**; mains **voltage and frequency **match the rating place. Main switch is OFF.
8 * **Protective housing** and **door interlocks** are intact; **laser viewing window** shows now damage.
9 * **Optics are clean**; remove any **transport/lens cover** only now. Avoid touching optics with bare hands.
10 * **Ambient conditions**: +15C to +35C. RH <90% non condensing; system acclimatized if temperature changed during transport.
11 * **Airflow **at 19" drawers is unobstructed; **filter mats** are clean to prevent heat build-up.
12 * **Fume extraction **is installed and operational (mandatory for personnel safety and to protect optics).
13 * Operator is familiar with **laser safety** requirements; responsibilities are defined.
14 **Note**: The Multi-Light and Multi-Light PLUS both contain a **Class 4 **laser** **source operated as **Class 1** in the closed cabin. Never bypass safety devices.
15
16
17
18 = Electrical Start-Up =
19
20 1. Connect the system to the specified **mains supply**. Ensure extraction is running.
21 1. Set the **mains switch to ON**. Internal electronics initialize; status indicators light as described on the operator panel.
22 1. Power on the **control PC** (or workstation) and peripherals needed for operation.
23
24
25
26 = Software and Device Connection =
27
28 1. Launch the **AnyMarker Designer **software.
29 1. Verify communication with the **laser controller** in the software (device connected, parameters readable).
30 If connection fails, switch **OFF**, check cabling and restart.
31
32 {{warning}}
33 **Important: Only start the laser software when the laser is switched on. If the laser is switched on while the software is running, the system will not work.**
34 {{/warning}}
35
36
37 = Initial Checks With Pilot Laser =
38
39 * Load or create a **test layout** in AnyMarker Designer.
40 * Enable the** pilot laser **to project contours on the workpiece; verify **orientation and placement** without laser emission. Keep the door closed.
41
42
43
44 = Z-Axis Focusing =
45
46 1. Place the workpiece/fixture in the work chamber and close the **manual lift door**.
47 1. Use the **automatic Z-axis** to set focus to the surface (per lens focal distance). Follow the on-screen/readout guidance for focal height.
48 1. Confirm best focus by pilot outline sharpness or focus gauge method recommended in the manual.
49
50
51
52 = Parameter Verification =
53
54 * Select a verified **marking parameter set** (power, speed, frequency, fill). Start with conservative energy to avoid burning or glare.
55 * Ensure extraction is active to remove **gases**, **vapors**, **aerosols**, **and dust** during test marking.
56
57
58
59 = First Test Mark =
60
61 1. With the cabin closed and interlocks engaged, execute a **short test mark** on a sample of the target material.
62 1. Observe quality and adjust **parameters **(e.g., reduce power/increase speed) as needed. Multiple **repetitions **may be used for depth, but monitor temperature to reduce fire risk.
63 1. If unexpected behavior occurs, press **STOP**/**EMERGENCY-STOP**, investigate messages in **Notifications**, and correct the cause before resuming.
64
65
66
67 = Post-Test Verification =
68
69 * Inspect the mark; check legibility/contrast. Clean light residue if necessary.
70 * Re-check **filters**/**airflow **after prolonged tests. Excess dust must not accumulate.
71 * Document the **approved parameter set** for production.
72
73
74
75 = Normal Operation Handover =
76
77 * Train operators on **door interlock**, **pilot laser**, **start**/**stop**, and **notifications **usage.
78 * Emphasize daily** pre-shift checks **(visible damage, labels present, safety devices functional).
79
80
81
82 = Shutdown (End of Day) =
83
84 1. Stop software and close the project.
85 1. Turn the system **OFF **via main switch; power down extraction as specified.
86 1. Clean the work area; never leave the machine **unattended **while powered.