1.3 | 1 | (% class="box infomessage" %) |
| 2 | ((( | ||
| |
1.2 | 3 | Use only spare parts, consumables, cleaning materials, and replacement components approved for the installed High-Light configuration. |
| |
1.3 | 4 | ))) |
| |
1.2 | 5 | |
| |
1.3 | 6 | (% class="box warningmessage" %) |
| 7 | ((( | ||
| 8 | Incorrect or incompatible components can affect marking quality, cooling performance machine reliability, and laser Class 1 protection. | ||
| 9 | ))) | ||
| 10 | |||
| 11 | = Consumable Items = | ||
| 12 | |||
| |
1.4 | 13 | The High-Light may require the following consumables during normal operation and maintenance: |
| 14 | |||
| 15 | == Ventilation Filter Mats == | ||
| 16 | |||
| |
1.5 | 17 | Filter mats protect the laser source, electronics, and computer components against dust and contamination in the cooling air. |
| 18 | |||
| |
1.6 | 19 | * Inspect the ventilation area monthly. |
| |
1.7 | 20 | * Replace heavily contaminated filter mats. |
| 21 | * Do not operate the system when airflow is restricted. | ||
| 22 | * Use the correct filter material and dimensions for the installed High-Light configuration | ||
| 23 | |||
| 24 | |||
| 25 | |||
| 26 | == Extraction Filters == | ||
| 27 | |||
| |
1.8 | 28 | When an extraction system is installed, its filters must be checked and replaced according to the process load and filter condition. |
| 29 | |||
| 30 | * Check the pre-filter at least monthly. | ||
| |
1.9 | 31 | * Replace the pre-filter when it is fully or heavily contaminated. |
| 32 | * Check the main filter at least annually. | ||
| 33 | * Replace the main filter when contaminated or when extraction performance decreases. | ||
| 34 | |||
| 35 | Processes that produce large quantities of dust, fumes, or aerosols may require more frequent filter replacement. | ||
| 36 | |||
| 37 | (% class="box warningmessage" %) | ||
| 38 | ((( | ||
| 39 | **Important**: Used extraction filters may contain hazardous process residues, Handle and dispose of them according to the processed material and applicable local requirements. | ||
| 40 | ))) | ||
| 41 | |||
| 42 | == Optical Cleaning Materials == | ||
| 43 | |||
| 44 | Only suitable optical-cleaning materials may be used on laser lenses and protective glass. | ||
| 45 | |||
| 46 | Approved cleaning materials may include: | ||
| 47 | |||
| 48 | * Soft, lint-free optical cloths | ||
| 49 | * Lens-cleaning paper | ||
| 50 | * Optical lens-cleaning wipes | ||
| 51 | * A small manual air blower | ||
| 52 | * A manufacturer-approved optical cleaning solution | ||
| 53 | * High-purity alcohol of at least 98%, where approved | ||
| 54 | |||
| 55 | Never use: | ||
| 56 | |||
| 57 | * Compressed air | ||
| 58 | * Paper towels or abrasive cloths | ||
| 59 | * Hard tools or scraping instruments | ||
| 60 | * Contaminated cleaning cloths | ||
| 61 | * Household glass cleaners | ||
| 62 | * Unapproved solvents | ||
| 63 | |||
| 64 | Apply the cleaning solution to the cloth rather than dipping the cloth into the solution | ||
| 65 | |||
| 66 | For complete cleaning instructions, refer to the **[[High-Light Maintenance Article>>doc:Schilling Marking Systems High-Light.Getting Started.Maintenance.WebHome]]**. | ||
| 67 | |||
| 68 | |||
| 69 | == Lubricants == | ||
| 70 | |||
| 71 | The Z-axis spindle should be inspected monthly and cleaned and lubricated when required. | ||
| 72 | |||
| 73 | Use only a lubricant approved for the installed axis. Do not allow oil or grease to contact optical components, workpieces, electrical parts, or marking surfaces. | ||
| 74 | |||
| 75 | |||
| 76 | == Laser Foil == | ||
| 77 | |||
| 78 | Laser foil is used to produce high-contrast markings on suitable metal surfaces. Its compatibility must be validated with the installed laser source, material, focus, and marking parameters. | ||
| 79 | |||
| 80 | |||
| 81 | == Ablation Film == | ||
| 82 | |||
| 83 | Ablation film can be marked and cut using a validated laser process before being bonded to the workpiece. Different film colors and material properties may be available. | ||
| 84 | |||
| 85 | For more information, refer to[[ **Accessories and Options**>>doc:Schilling Marking Systems High-Light.Overview.Accessories and Options.WebHome]]. | ||
| 86 | |||
| 87 |