jadomatis 1.1 1 **Description**: Learn how to transport, unpack, position and prepare High-Light laser marking system for commisioning.
2
jadomatis 3.2 3 {{toc/}}
4
jadomatis 1.1 5 ----
6
7 (% class="box warningmessage" %)
8 (((
jadomatis 1.2 9 Transportation, unpacking, and installation must only be performed by qualified personnel using suitable lifting and handling equipment.
jadomatis 1.1 10 )))
jadomatis 1.2 11
jadomatis 3.3 12 = After Delivery: Unloading and Inspection =
jadomatis 1.2 13
jadomatis 1.3 14 After unloading the High-Light:
15
16 * Inspect the machine and its components for visible transport damage.
17 * Check screws, fasteners, and connections for damage or loosening.
18 * Verify that the delivery is complete.
jadomatis 1.4 19 * Inspect the transport packaging for evidence of impact, tilting, or mishandling.
20
jadomatis 1.5 21 If damage or missing components are discovered:
jadomatis 1.4 22
jadomatis 1.5 23 1. Record the details immediately in writing.
24 1. Note the damage or missing items on the freight documentation
25 1. Photograph the affected packaging and machine components.
26 1. Send a report to Schilling Marking Systems GmbH.
27
jadomatis 3.3 28 (% class="box warningmessage" %)
29 (((
30 Do not commission a visibly damaged system.
31 )))
jadomatis 1.5 32
jadomatis 3.3 33 (% class="box warningmessage" %)
34 (((
35 **Caution**: Keep the protective cover on the lens unit until installation is complete. The optical components are sensitive, and their condition directly affects the marking results.
36 )))
jadomatis 1.5 37
jadomatis 3.2 38 = Transport =
jadomatis 1.5 39
jadomatis 1.6 40 == Shipping and Long-Distance Transport ==
41
42 The High-Light must be transported in the original packaging around its wheeled base frame.
43
jadomatis 1.7 44 * Keep the machine upright.
45 * Secure the packaged system against slipping and tipping.
46 * Use a forklift suitable for the total machine and packaging weight.
jadomatis 1.8 47 * Avoid impacts, strong vibrations, and mechanical loads.
48 * Reinstall the door transport restraint before long-distance transport.
49 * Whenever possible, package the system exactly as it was delivered.
50
jadomatis 1.9 51 Do not transport the High-Light while it is connected to the electrical supply or extraction system.
52
53 == In-Plant Transport ==
54
jadomatis 3.2 55 (% class="box infomessage" %)
56 (((
57 Avoid strong impacts, vibrations, or sudden movements during transport.
58 )))
59
60 After repositioning, the High-Light must be realigned. The electrical system must be recommissioned and a functional test must be completed before production resumes.
61
jadomatis 1.10 62 Before moving the High-Light within the facility:
63
jadomatis 1.11 64 1. Finish or safely stop all active marking operations.
65 1. Close marking software.
66 1. Switch off the system using main switch.
67 1. Disconnect the electrical supply cable.
68 1. Disconnect and remove the extraction connection.
69 1. Secure the lifting door and other movable components as required.
70 1. Use a suitable forklift to lift the machine slightly.
71 1. Move the machine while keeping it upright.
72 1. Place it on a level, clean, and stable floor.
73
jadomatis 3.2 74 = Unpacking =
75
jadomatis 1.11 76 (% class="box infomessage" %)
77 (((
jadomatis 3.2 78 Retain the original packaging and door transport restraint for future long-distance tranports.
jadomatis 1.11 79 )))
80
81 The High-Light must only be unpacked by qualified personnel.
82
83 At least two people are required to remove the transport packaging safely.
84
85 1. Place the packaged machine upright on level ground using a suitable forklift.
86 1. Make sure the package is stable before opening it.
87 1. Remove the protective film.
88 1. Carefully remove the carton and remaining packaging material.
89 1. Release and remove the transport restraints.
90 1. Check the machine again for concealed transport damage.
91 1. Verify that no packaging material remains inside or around the machine.
92
93 (% class="box infomessage" %)
94 (((
jadomatis 3.2 95 Open and remove the carton carefully to prevent packaging sections from tipping or falling.
jadomatis 1.11 96 )))
97
jadomatis 3.2 98 = Mechanical And Electrical Installation =
jadomatis 1.11 99
100 Place the High-Light in it's intended operating location.
101
102 The installation location must:
103
104 * Have a level, clean, and stable floor.
105 * Provide sufficient space for operating and servicing the machine.
106 * Allow the lifting door to move through its complete travel without obstruction.
107 * Provide sufficient clearance around the ventilation openings.
108 * Allow safe access to the main switch and Emergency Stop.
109 * Provide a suitable connection for the extraction system.
110 * Protect the system from impacts, excessive vibration, moisture, and contamination.
111
jadomatis 3.2 112 = Positioning The High-Light =
jadomatis 1.11 113
114 Before connecting the system:
115
116 * Remove all packaging and transport restraints
117 * Make sure the High-Light is upright and correctly alligned.
118 * Inspect the electrical supply cable and plug for damage.
jadomatis 1.12 119 * Verify that the available mains voltage and frequency match the machine requirements.
120 * Make sure the main switch on the operating panel is in the OFF position.
121 * Check the laser protection window for cracks, scratches, or other damage.
jadomatis 1.13 122 * Check that all housing panel and protective components are installed securely.
123 * Check that optical components are free from dust and contamination.
124 * Confirm that the protective cover remains on the focusing lens until the installation work is complete.
125
126 After completing these checks:
127
128 1. Connect the extraction system.
129 1. Connect the electrical supply.
130 1. Remove the protective cover from the focusing lens.
131 1. Check that the automatic lifting door is unobstructed.
132 1. Check that the X-, Y-, and Z-axis travel areas are clear.
133 1. Prepare the system for electrical commissioning and functional testing.
134
jadomatis 3.2 135 (% class="box warningmessage" %)
136 (((
jadomatis 1.13 137 Do not manually force the lifting door or any software control axis.
jadomatis 3.2 138 )))
jadomatis 1.13 139
140 = Environmental Requirements =
141
142 The installation location must meet the following conditions:
143
144 1. Ambient temperature between +15 C and +35 C.
145 1. Relative humidity not exceeding 90%, non-condensing.
146 1. Sufficient ventilation around the system.
147 1. Unobstructed airflow at the electronic modules, ventilation openings, filter mats.
148 1. Suitable extraction for fumes, vapors, aerosols, and particles generated during marking.
149
150 (% class="box infomessage" %)
151 (((
152 If the High-Light has been exposed to significant temperature changes, allow it to reach room temperature before switching it on.
153 )))
154
155 (% class="box warningmessage" %)
156 (((
157 Mechanical loads, impacts, and vibrations must be avoided because the system contains sensitive electrical and optical components.
158 )))
159
160 = Pre-Commissioning Checklist =
161
162 Before the High-Light is switched on for the first time, verify that:
163
jadomatis 1.14 164 * The electrical installation is complete.
165 * The input voltage and frequency are correct.
166 * The machine is correctly positioned and alligned.
jadomatis 1.15 167 * All packaging and transport restraints have been removed.
168 * The lifting door can move without obstruction.
169 * The X-, Y-, Z-axis travel areas are clear.
170 * The extraction system is connected and ready.
171 * The laser protection window is undamaged,
172 * All protective panels are present and secured.
173 * The optical components are clean.
174 * The protective lens coved has been removed.
175 * The environment conditions meet the technical specifications.
176 * All required laser safety measures have been implemented.
177 * The operating personnel are familiar with the applicable laser safety requirements.
178
jadomatis 1.16 179 (% class="box warningmessage" %)
180 (((
181 The High-Light may only be switched on after an authorized person has verified that the installation and all laser safety provisions comply with the applicable requirements.
182 )))
183
184 = After Repositioning or Transport =
185
jadomatis 3.2 186 After any transport or significant repositioning:
187
188 1. Inspect the machine for damage.
189 1. Confirm that the machine is level and correctly aligned.
190 1. Check all electrical and extraction connections.
191 1. Check the lifting-door safety function.
192 1. Check the Emergency Stop.
193 1. Perform the required axis reference movements.
194 1. Perform an electrical recommissioning check.
195 1. Complete a functional test before returning the machine to production.
196
197 (% class="box warningmessage" %)
198 (((
199 If the machine was damaged, tilted, subjected to a significant impact, or cannot be recommissioned normally, keep it switched off and contact Schilling Marking Systems or authorized service personnel.
200 )))
201
202 (% class="box infomessage" %)
203 (((