Wiki-Quellcode von Transportation and Installation
Zeige letzte Bearbeiter
| author | version | line-number | content |
|---|---|---|---|
| 1 | **Description**: Learn how to transport, unpack, position and prepare High-Light laser marking system for commisioning. | ||
| 2 | |||
| 3 | ---- | ||
| 4 | |||
| 5 | (% class="box warningmessage" %) | ||
| 6 | ((( | ||
| 7 | Transportation, unpacking, and installation must only be performed by qualified personnel using suitable lifting and handling equipment. | ||
| 8 | ))) | ||
| 9 | |||
| 10 | |||
| 11 | = After Delivery: Unloading And Inspection = | ||
| 12 | |||
| 13 | After unloading the High-Light: | ||
| 14 | |||
| 15 | * Inspect the machine and its components for visible transport damage. | ||
| 16 | * Check screws, fasteners, and connections for damage or loosening. | ||
| 17 | * Verify that the delivery is complete. | ||
| 18 | * Inspect the transport packaging for evidence of impact, tilting, or mishandling. | ||
| 19 | |||
| 20 | If damage or missing components are discovered: | ||
| 21 | |||
| 22 | 1. Record the details immediately in writing. | ||
| 23 | 1. Note the damage or missing items on the freight documentation | ||
| 24 | 1. Photograph the affected packaging and machine components. | ||
| 25 | 1. Send a report to Schilling Marking Systems GmbH. | ||
| 26 | |||
| 27 | |||
| 28 | |||
| 29 | (% class="box warningmessage" %) | ||
| 30 | ((( | ||
| 31 | Do not commission a visibly damaged system. | ||
| 32 | ))) | ||
| 33 | |||
| 34 | (% class="box warningmessage" %) | ||
| 35 | ((( | ||
| 36 | **Caution**: Keep the protective cover on the lens unit until installation is complete. The optical components are sensitive, and their condition directly affects the marking results. | ||
| 37 | ))) | ||
| 38 | |||
| 39 | |||
| 40 | = Transport = | ||
| 41 | |||
| 42 | == Shipping and Long-Distance Transport == | ||
| 43 | |||
| 44 | The High-Light must be transported in the original packaging around its wheeled base frame. | ||
| 45 | |||
| 46 | * Keep the machine upright. | ||
| 47 | * Secure the packaged system against slipping and tipping. | ||
| 48 | * Use a forklift suitable for the total machine and packaging weight. | ||
| 49 | * Avoid impacts, strong vibrations, and mechanical loads. | ||
| 50 | * Reinstall the door transport restraint before long-distance transport. | ||
| 51 | * Whenever possible, package the system exactly as it was delivered. | ||
| 52 | |||
| 53 | Do not transport the High-Light while it is connected to the electrical supply or extraction system. | ||
| 54 | |||
| 55 | |||
| 56 | == In-Plant Transport == | ||
| 57 | |||
| 58 | Before moving the High-Light within the facility: | ||
| 59 | |||
| 60 | 1. Finish or safely stop all active marking operations. | ||
| 61 | 1. Close marking software. | ||
| 62 | 1. Switch off the system using main switch. | ||
| 63 | 1. Disconnect the electrical supply cable. | ||
| 64 | 1. Disconnect and remove the extraction connection. | ||
| 65 | 1. Secure the lifting door and other movable components as required. | ||
| 66 | 1. Use a suitable forklift to lift the machine slightly. | ||
| 67 | 1. Move the machine while keeping it upright. | ||
| 68 | 1. Place it on a level, clean, and stable floor. | ||
| 69 | |||
| 70 | (% class="box infomessage" %) | ||
| 71 | ((( | ||
| 72 | Avoid strong impacts, vibrations, or sudden movements during transport. | ||
| 73 | ))) | ||
| 74 | |||
| 75 | After repositioning, the High-Light must be realigned. The electrical system must be recommissioned and a functional test must be completed before production resumes. | ||
| 76 | |||
| 77 | |||
| 78 | = Unpacking = | ||
| 79 | |||
| 80 | The High-Light must only be unpacked by qualified personnel. | ||
| 81 | |||
| 82 | At least two people are required to remove the transport packaging safely. | ||
| 83 | |||
| 84 | 1. Place the packaged machine upright on level ground using a suitable forklift. | ||
| 85 | 1. Make sure the package is stable before opening it. | ||
| 86 | 1. Remove the protective film. | ||
| 87 | 1. Carefully remove the carton and remaining packaging material. | ||
| 88 | 1. Release and remove the transport restraints. | ||
| 89 | 1. Check the machine again for concealed transport damage. | ||
| 90 | 1. Verify that no packaging material remains inside or around the machine. | ||
| 91 | |||
| 92 | Open and remove the carton carefully to prevent packaging sections from tipping or falling. | ||
| 93 | |||
| 94 | (% class="box infomessage" %) | ||
| 95 | ((( | ||
| 96 | Retain the original packaging and door transport restraint for future long-distance tranports. | ||
| 97 | ))) | ||
| 98 | |||
| 99 | |||
| 100 | = Positioning The High-Light = | ||
| 101 | |||
| 102 | Place the High-Light in it's intended operating location. | ||
| 103 | |||
| 104 | The installation location must: | ||
| 105 | |||
| 106 | * Have a level, clean, and stable floor. | ||
| 107 | * Provide sufficient space for operating and servicing the machine. | ||
| 108 | * Allow the lifting door to move through its complete travel without obstruction. | ||
| 109 | * Provide sufficient clearance around the ventilation openings. | ||
| 110 | * Allow safe access to the main switch and Emergency Stop. | ||
| 111 | * Provide a suitable connection for the extraction system. | ||
| 112 | * Protect the system from impacts, excessive vibration, moisture, and contamination. | ||
| 113 | |||
| 114 | (% class="box infomessage" %) | ||
| 115 | ((( | ||
| 116 | Make sure the monitor arm, keyboard holder, lifting door, and other movable components can be used without striking walls, equipment, or surrounding objects. | ||
| 117 | ))) | ||
| 118 | |||
| 119 | |||
| 120 | |||
| 121 | = Mechanical And Electrical Installation = | ||
| 122 | |||
| 123 | Before connecting the system: | ||
| 124 | |||
| 125 | * Remove all packaging and transport restraints | ||
| 126 | * Make sure the High-Light is upright and correctly alligned. | ||
| 127 | * Inspect the electrical supply cable and plug for damage. | ||
| 128 | * Verify that the available mains voltage and frequency match the machine requirements. | ||
| 129 | * Make sure the main switch on the operating panel is in the OFF position. | ||
| 130 | * Check the laser protection window for cracks, scratches, or other damage. | ||
| 131 | * Check that all housing panel and protective components are installed securely. | ||
| 132 | * Check that optical components are free from dust and contamination. | ||
| 133 | * Confirm that the protective cover remains on the focusing lens until the installation work is complete. | ||
| 134 | |||
| 135 | After completing these checks: | ||
| 136 | |||
| 137 | 1. Connect the extraction system. | ||
| 138 | 1. Connect the electrical supply. | ||
| 139 | 1. Remove the protective cover from the focusing lens. | ||
| 140 | 1. Check that the automatic lifting door is unobstructed. | ||
| 141 | 1. Check that the X-, Y-, and Z-axis travel areas are clear. | ||
| 142 | 1. Prepare the system for electrical commissioning and functional testing. | ||
| 143 | |||
| 144 | (% class="box warningmessage" %) | ||
| 145 | ((( | ||
| 146 | Do not manually force the lifting door or any software control axis. | ||
| 147 | ))) | ||
| 148 | |||
| 149 | |||
| 150 | |||
| 151 | = Environmental Requirements = | ||
| 152 | |||
| 153 | The installation location must meet the following conditions: | ||
| 154 | |||
| 155 | 1. Ambient temperature between +15 C and +35 C. | ||
| 156 | 1. Relative humidity not exceeding 90%, non-condensing. | ||
| 157 | 1. Sufficient ventilation around the system. | ||
| 158 | 1. Unobstructed airflow at the electronic modules, ventilation openings, filter mats. | ||
| 159 | 1. Suitable extraction for fumes, vapors, aerosols, and particles generated during marking. | ||
| 160 | |||
| 161 | (% class="box infomessage" %) | ||
| 162 | ((( | ||
| 163 | If the High-Light has been exposed to significant temperature changes, allow it to reach room temperature before switching it on. | ||
| 164 | ))) | ||
| 165 | |||
| 166 | (% class="box warningmessage" %) | ||
| 167 | ((( | ||
| 168 | Mechanical loads, impacts, and vibrations must be avoided because the system contains sensitive electrical and optical components. | ||
| 169 | ))) | ||
| 170 | |||
| 171 | |||
| 172 | |||
| 173 | = Pre-Commissioning Checklist = | ||
| 174 | |||
| 175 | Before the High-Light is switched on for the first time, verify that: | ||
| 176 | |||
| 177 | * The electrical installation is complete. | ||
| 178 | * The input voltage and frequency are correct. | ||
| 179 | * The machine is correctly positioned and alligned. | ||
| 180 | * All packaging and transport restraints have been removed. | ||
| 181 | * The lifting door can move without obstruction. | ||
| 182 | * The X-, Y-, Z-axis travel areas are clear. | ||
| 183 | * The extraction system is connected and ready. | ||
| 184 | * The laser protection window is undamaged, | ||
| 185 | * All protective panels are present and secured. | ||
| 186 | * The optical components are clean. | ||
| 187 | * The protective lens coved has been removed. | ||
| 188 | * The environment conditions meet the technical specifications. | ||
| 189 | * All required laser safety measures have been implemented. | ||
| 190 | * The operating personnel are familiar with the applicable laser safety requirements. | ||
| 191 | |||
| 192 | (% class="box warningmessage" %) | ||
| 193 | ((( | ||
| 194 | The High-Light may only be switched on after an authorized person has verified that the installation and all laser safety provisions comply with the applicable requirements. | ||
| 195 | ))) | ||
| 196 | |||
| 197 | |||
| 198 | |||
| 199 | = After Repositioning or Transport = | ||
| 200 | |||
| 201 | After any transport or significant repositioning: | ||
| 202 | |||
| 203 | 1. Inspect the machine for damage. | ||
| 204 | 1. Confirm that the machine is level and correctly aligned. | ||
| 205 | 1. Check all electrical and extraction connections. | ||
| 206 | 1. Check the lifting-door safety function. | ||
| 207 | 1. Check the Emergency Stop. | ||
| 208 | 1. Perform the required axis reference movements. | ||
| 209 | 1. Perform an electrical recommissioning check. | ||
| 210 | 1. Complete a functional test before returning the machine to production. | ||
| 211 | |||
| 212 | (% class="box warningmessage" %) | ||
| 213 | ((( | ||
| 214 | If the machine was damaged, tilted, subjected to a significant impact, or cannot be recommissioned normally, keep it switched off and contact Schilling Marking Systems or authorized service personnel. | ||
| 215 | ))) |