Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -12,23 +12,4 @@ 12 12 Before switching on the High-Light: 13 13 14 14 * Check the system for visible damage, 15 -* Make sure the protective housing, lifting door, safety switches and laser protection window are undamaged. 16 -* Make sure all covers and protective panels are installed correctly. 17 -* Check that the Emergency Stop button is released. 18 -* Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes, 19 -* Check that the ventilation openings and filter mats are unobstructed. 20 -* Make sure the extraction system is connected and ready for operation. 21 -* Check that the optical components are clean. 22 -* Remove the protective cover from the laser focusing lens. 23 -* Make sure the work area is clear of unnecessary objects. 24 - 25 -Do not operate the system if the protective housing, lifting door, safety switches, sealing profiles, or laser protection window are damaged. 26 - 27 - 28 -= Switch On = 29 - 30 -1. Make sure the cabin door is open. 31 -1. Connect the control PC or laptop to the laser system. 32 -1. Switch on the laser system. 33 -1. If the blue Acknowledge button is illuminated, press it once. 34 -1. Start the marking software 15 +* Make sure the protective housing, lift