Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -31,4 +31,59 @@ 31 31 1. Connect the control PC or laptop to the laser system. 32 32 1. Switch on the laser system. 33 33 1. If the blue Acknowledge button is illuminated, press it once. 34 -1. Start the marking software 34 +1. Start the marking software configured for the system - Never start laser marking software before turning on the laser system. 35 +1. Wait for the software to connect to the laser automatically. 36 +1. Confirm that the green system-ready LED is illuminated continuously. 37 +1. Confirm that the two red positioned-laser points are visible. 38 + 39 +The High-Light is now ready for job preparation. 40 + 41 + 42 += Prepare the Marking Job = 43 + 44 +1. Perform the reference run required by the installed axis configuration. 45 +The standard High-Light configuration includes software-controlled X,Y and Z axes. Complete all reference movements requested by the control software before positioning the workpiece. 46 +1. Create a new marking file or open an approved existing file. 47 +1. Load the validated marking parameters for the workpiece material and required marking result. 48 +1. Set the Z-axis to the required focal height. 49 +1. Secure the workpiece in the appropriate fixture. 50 +1. Use the pilot laser to display the marking area or marking contours. 51 +1. Check that the marking is correctly positioned on the workpiece. 52 +1. Where the marking program uses X- and Y-axis movement, verify that the programmed axis positions and travel area are suitable for the installed fixture and workpiece. 53 + 54 +Do not start the marking process until the workpiece is securely positioned and the marking location has been verified. 55 + 56 + 57 += Run the Marking = 58 + 59 +1. Switch on the extraction system. 60 +1. Close the cabin door completely. 61 +1. Confirm that the yellow LED is illuminated. This indicated that the door safely circuit is satisfied. 62 +1. Check the marking software for active warnings or fault messages. 63 +1. Start the marking process. 64 +1. During the marking, the red laser-active LED should be illuminated. 65 +1. The programmed marking sequence runs automatically. 66 +1. Monitor the system during operation. Do not leave High-Light unattended. 67 +1. When the marking process is complete, the red LED switches off while the yellow LED remains illuminated. 68 +1. Open the lifting door using the normal machine controls and remove the marked workpiece. 69 + 70 +(% class="box warningmessage" %) 71 +((( 72 +Never open the cabin or attempt to access the work are while the red laser-active LED is illuminated. 73 +))) 74 + 75 + 76 + 77 += Check the Marking Results = 78 + 79 +Inspect the completed marking for: 80 + 81 +* Correct position 82 +* Legibility 83 +* Contrast 84 +* Completeness 85 +* Required marking depth or surface effect 86 + 87 +If the result is unsatisfactory, check the focal height, workpiece position, marking parameters, and selected marking file before repeating the process. 88 + 89 +Do not change validated