Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -27,4 +27,18 @@ 27 27 28 28 = Switch On = 29 29 30 +1. Make sure the cabin door is open. 31 +1. Connect the control PC or laptop to the laser system. 32 +1. Switch on the laser system. 33 +1. If the blue Acknowledge button is illuminated, press it once. 34 +1. Start the marking software configured for the system - Never start laser marking software before turning on the laser system. 35 +1. Wait for the software to connect to the laser automatically. 36 +1. Confirm that the green system-ready LED is illuminated continuously. 37 +1. Confirm that the two red positioned-laser points are visible. 38 + 39 +The High-Light is now ready for job preparation. 40 + 41 + 42 += Prepare the Marking Job = 43 + 30 30 1.