Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,25 +1,1 @@ 1 -**Description: **Learn the normal operating sequence for the High-Light laser marking system, including switching on the system, preparing and running a marking job, and shutting down the system. 2 - 3 ----- 4 - 5 -(% class="box warningmessage" %) 6 -((( 7 -Only trained and authorized personnel may operate the High-Light. Observe all applicable laser safety instructions before using the system. 8 -))) 9 - 10 -= Before You Start = 11 - 12 -Before switching on the High-Light: 13 - 14 -* Check the system for visible damage, 15 -* Make sure the protective housing, lifting door, safety switches and laser protection window are undamaged. 16 -* Make sure all covers and protective panels are installed correctly. 17 -* Check that the Emergency Stop button is released. 18 -* Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes, 19 -* Check that the ventilation openings and filter mats are unobstructed. 20 -* Make sure the extraction system is connected and ready for operation. 21 -* Check that the optical components are clean. 22 -* Remove the protective cover from the laser focusing lens. 23 -* Make sure the work area is clear of unnecessary objects. 24 - 25 -Do 1 +**Description: **Learn the normal operating sequence for the High-Light laser marking system, including switching on the system, preparing and running a marking job, and shu