Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -18,4 +18,17 @@ 18 18 * Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes, 19 19 * Check that the ventilation openings and filter mats are unobstructed. 20 20 * Make sure the extraction system is connected and ready for operation. 21 -* 21 +* Check that the optical components are clean. 22 +* Remove the protective cover from the laser focusing lens. 23 +* Make sure the work area is clear of unnecessary objects. 24 + 25 +Do not operate the system if the protective housing, lifting door, safety switches, sealing profiles, or laser protection window are damaged. 26 + 27 + 28 += Switch On = 29 + 30 +1. Make sure the cabin door is open. 31 +1. Connect the control PC or laptop to the laser system. 32 +1. Switch on the laser system. 33 +1. If the blue Acknowledge button is illuminated, press it once. 34 +1. Start the marking software