Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -12,4 +12,10 @@ 12 12 Before switching on the High-Light: 13 13 14 14 * Check the system for visible damage, 15 -* Make sure the protective housing, lift 15 +* Make sure the protective housing, lifting door, safety switches and laser protection window are undamaged. 16 +* Make sure all covers and protective panels are installed correctly. 17 +* Check that the Emergency Stop button is released. 18 +* Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes, 19 +* Check that the ventilation openings and filter mats are unobstructed. 20 +* Make sure the extraction system is connected and ready for operation. 21 +*