Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -39,7 +39,7 @@ 39 39 The High-Light is now ready for job preparation. 40 40 41 41 42 -= Prepare the Marking Job =42 += Prepare The Marking Job = 43 43 44 44 1. Perform the reference run required by the installed axis configuration. 45 45 The standard High-Light configuration includes software-controlled X,Y and Z axes. Complete all reference movements requested by the control software before positioning the workpiece. ... ... @@ -54,7 +54,7 @@ 54 54 Do not start the marking process until the workpiece is securely positioned and the marking location has been verified. 55 55 56 56 57 -= Run the Marking =57 += Run The Marking = 58 58 59 59 1. Switch on the extraction system. 60 60 1. Close the cabin door completely. ... ... @@ -74,7 +74,7 @@ 74 74 75 75 76 76 77 -= Check the Marking Results =77 += Check The Marking Results = 78 78 79 79 Inspect the completed marking for: 80 80 ... ... @@ -101,4 +101,13 @@ 101 101 102 102 103 103 104 - 104 += If The System Is Not Ready = 105 + 106 +* **Green LED remains off**: The system may be waiting for acknowledgement. Press the blue Acknowledge button. 107 +* **Blue button remains illuminated**: Check that the Emergency Stop button is released. 108 +* **Yellow LED remains off**: Check that the cabin door is completely closed 109 +* **Red LED does not illuminate when marking is started**: Check the Emergency Stop, cabin door, safety circuit, and software messages. 110 +* **Marking is weak or not visible**: Check the Z-axis position and focal height, then verify the marking parameters. 111 +* **Axis movement is unavailable**: Complete the required reference run and clear any active fault messages. 112 + 113 +If a fault cannot be corrected safely, switch off the system and contact Schilling Marking Systems or authorized personnel.