Last modified by jadomatis on 2026/09/01 08:14

From version 1.21
edited by jadomatis
on 2026/09/01 08:06
Change comment: There is no comment for this version
To version 1.17
edited by jadomatis
on 2026/09/01 07:58
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -65,40 +65,4 @@
65 65  1. The programmed marking sequence runs automatically.
66 66  1. Monitor the system during operation. Do not leave High-Light unattended.
67 67  1. When the marking process is complete, the red LED switches off while the yellow LED remains illuminated.
68 -1. Open the lifting door using the normal machine controls and remove the marked workpiece.
69 -
70 -(% class="box warningmessage" %)
71 -(((
72 -Never open the cabin or attempt to access the work are while the red laser-active LED is illuminated.
73 -)))
74 -
75 -
76 -
77 -= Check the Marking Results =
78 -
79 -Inspect the completed marking for:
80 -
81 -* Correct position
82 -* Legibility
83 -* Contrast
84 -* Completeness
85 -* Required marking depth or surface effect
86 -
87 -If the result is unsatisfactory, check the focal height, workpiece position, marking parameters, and selected marking file before repeating the process.
88 -
89 -Do not change validated production parameters without authorization.
90 -
91 -
92 -= Shutdown =
93 -
94 -1. Allow the current marking process to finish or stop it safely through the marking software.
95 -1. Save the marking file and any required production data.
96 -1. Close the marking software on the control PC.
97 -1. Switch off the laser system using the main switch.
98 -1. Switch off the extraction system after any remaining fumes or particles have been removed from the cabin.
99 -1. Remove finished workpieces and unnecessary materials from the work area.
100 -1. Leave the cabin and surrounding work area clean.
101 -
102 -
103 -
104 -
68 +1. Open the lifting door u