Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -63,3 +63,42 @@ 63 63 1. Start the marking process. 64 64 1. During the marking, the red laser-active LED should be illuminated. 65 65 1. The programmed marking sequence runs automatically. 66 +1. Monitor the system during operation. Do not leave High-Light unattended. 67 +1. When the marking process is complete, the red LED switches off while the yellow LED remains illuminated. 68 +1. Open the lifting door using the normal machine controls and remove the marked workpiece. 69 + 70 +(% class="box warningmessage" %) 71 +((( 72 +Never open the cabin or attempt to access the work are while the red laser-active LED is illuminated. 73 +))) 74 + 75 + 76 + 77 += Check the Marking Results = 78 + 79 +Inspect the completed marking for: 80 + 81 +* Correct position 82 +* Legibility 83 +* Contrast 84 +* Completeness 85 +* Required marking depth or surface effect 86 + 87 +If the result is unsatisfactory, check the focal height, workpiece position, marking parameters, and selected marking file before repeating the process. 88 + 89 +Do not change validated production parameters without authorization. 90 + 91 + 92 += Shutdown = 93 + 94 +1. Allow the current marking process to finish or stop it safely through the marking software. 95 +1. Save the marking file and any required production data. 96 +1. Close the marking software on the control PC. 97 +1. Switch off the laser system using the main switch. 98 +1. Switch off the extraction system after any remaining fumes or particles have been removed from the cabin. 99 +1. Remove finished workpieces and unnecessary materials from the work area. 100 +1. Leave the cabin and surrounding work area clean. 101 + 102 + 103 + 104 +