Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -12,51 +12,4 @@ 12 12 Before switching on the High-Light: 13 13 14 14 * Check the system for visible damage, 15 -* Make sure the protective housing, lifting door, safety switches and laser protection window are undamaged. 16 -* Make sure all covers and protective panels are installed correctly. 17 -* Check that the Emergency Stop button is released. 18 -* Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes, 19 -* Check that the ventilation openings and filter mats are unobstructed. 20 -* Make sure the extraction system is connected and ready for operation. 21 -* Check that the optical components are clean. 22 -* Remove the protective cover from the laser focusing lens. 23 -* Make sure the work area is clear of unnecessary objects. 24 - 25 -Do not operate the system if the protective housing, lifting door, safety switches, sealing profiles, or laser protection window are damaged. 26 - 27 - 28 -= Switch On = 29 - 30 -1. Make sure the cabin door is open. 31 -1. Connect the control PC or laptop to the laser system. 32 -1. Switch on the laser system. 33 -1. If the blue Acknowledge button is illuminated, press it once. 34 -1. Start the marking software configured for the system - Never start laser marking software before turning on the laser system. 35 -1. Wait for the software to connect to the laser automatically. 36 -1. Confirm that the green system-ready LED is illuminated continuously. 37 -1. Confirm that the two red positioned-laser points are visible. 38 - 39 -The High-Light is now ready for job preparation. 40 - 41 - 42 -= Prepare the Marking Job = 43 - 44 -1. Perform the reference run required by the installed axis configuration. 45 -The standard High-Light configuration includes software-controlled X,Y and Z axes. Complete all reference movements requested by the control software before positioning the workpiece. 46 -1. Create a new marking file or open an approved existing file. 47 -1. Load the validated marking parameters for the workpiece material and required marking result. 48 -1. Set the Z-axis to the required focal height. 49 -1. Secure the workpiece in the appropriate fixture. 50 -1. Use the pilot laser to display the marking area or marking contours. 51 -1. Check that the marking is correctly positioned on the workpiece. 52 -1. Where the marking program uses X- and Y-axis movement, verify that the programmed axis positions and travel area are suitable for the installed fixture and workpiece. 53 - 54 -Do not start the marking process until the workpiece is securely positioned and the marking location has been verified. 55 - 56 - 57 -= Run the Marking = 58 - 59 -1. Switch on the extraction system. 60 -1. Close the cabin door completely. 61 -1. Confirm that the yellow LED is illuminated. This indicated that the door safely circuit is satisfied. 62 -1. Check the marking software for active warnings or fault messages 15 +* Make sure the protective housing, lift