Changes for page Operation (Start, Run, Shutdown)
Last modified by jadomatis on 2026/09/01 08:14
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -39,7 +39,7 @@ 39 39 The High-Light is now ready for job preparation. 40 40 41 41 42 -= Prepare the Marking Job =42 += Prepare The Marking Job = 43 43 44 44 1. Perform the reference run required by the installed axis configuration. 45 45 The standard High-Light configuration includes software-controlled X,Y and Z axes. Complete all reference movements requested by the control software before positioning the workpiece. ... ... @@ -54,9 +54,54 @@ 54 54 Do not start the marking process until the workpiece is securely positioned and the marking location has been verified. 55 55 56 56 57 -= Run the Marking =57 += Run The Marking = 58 58 59 59 1. Switch on the extraction system. 60 60 1. Close the cabin door completely. 61 61 1. Confirm that the yellow LED is illuminated. This indicated that the door safely circuit is satisfied. 62 -1. Check the marking software for active warnings or fault messages 62 +1. Check the marking software for active warnings or fault messages. 63 +1. Start the marking process. 64 +1. During the marking, the red laser-active LED should be illuminated. 65 +1. The programmed marking sequence runs automatically. 66 +1. Monitor the system during operation. Do not leave High-Light unattended. 67 +1. When the marking process is complete, the red LED switches off while the yellow LED remains illuminated. 68 +1. Open the lifting door using the normal machine controls and remove the marked workpiece. 69 + 70 +(% class="box warningmessage" %) 71 +((( 72 +Never open the cabin or attempt to access the work are while the red laser-active LED is illuminated. 73 +))) 74 + 75 + 76 + 77 += Check The Marking Results = 78 + 79 +Inspect the completed marking for: 80 + 81 +* Correct position 82 +* Legibility 83 +* Contrast 84 +* Completeness 85 +* Required marking depth or surface effect 86 + 87 +If the result is unsatisfactory, check the focal height, workpiece position, marking parameters, and selected marking file before repeating the process. 88 + 89 +Do not change validated production parameters without authorization. 90 + 91 + 92 += Shutdown = 93 + 94 +1. Allow the current marking process to finish or stop it safely through the marking software. 95 +1. Save the marking file and any required production data. 96 +1. Close the marking software on the control PC. 97 +1. Switch off the laser system using the main switch. 98 +1. Switch off the extraction system after any remaining fumes or particles have been removed from the cabin. 99 +1. Remove finished workpieces and unnecessary materials from the work area. 100 +1. Leave the cabin and surrounding work area clean. 101 + 102 + 103 + 104 += If The System Is Not Ready = 105 + 106 +* Green LED remains off: 107 +* Blue button remains illuminated: