Last modified by jadomatis on 2026/09/01 08:14

From version 1.1
edited by jadomatis
on 2026/09/01 06:56
Change comment: There is no comment for this version
To version 1.18
edited by jadomatis
on 2026/09/01 07:59
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -1,1 +1,77 @@
1 -**Description: **Learn the normal operating sequence for the High-Light laser marking system, including switching on the system, preparing and running a marking job, and shu
1 +**Description: **Learn the normal operating sequence for the High-Light laser marking system, including switching on the system, preparing and running a marking job, and shutting down the system.
2 +
3 +----
4 +
5 +(% class="box warningmessage" %)
6 +(((
7 +Only trained and authorized personnel may operate the High-Light. Observe all applicable laser safety instructions before using the system.
8 +)))
9 +
10 += Before You Start =
11 +
12 +Before switching on the High-Light:
13 +
14 +* Check the system for visible damage,
15 +* Make sure the protective housing, lifting door, safety switches and laser protection window are undamaged.
16 +* Make sure all covers and protective panels are installed correctly.
17 +* Check that the Emergency Stop button is released.
18 +* Make sure the system has acclimatized to room temperature if it exposed to significant temperature changes,
19 +* Check that the ventilation openings and filter mats are unobstructed.
20 +* Make sure the extraction system is connected and ready for operation.
21 +* Check that the optical components are clean.
22 +* Remove the protective cover from the laser focusing lens.
23 +* Make sure the work area is clear of unnecessary objects.
24 +
25 +Do not operate the system if the protective housing, lifting door, safety switches, sealing profiles, or laser protection window are damaged.
26 +
27 +
28 += Switch On =
29 +
30 +1. Make sure the cabin door is open.
31 +1. Connect the control PC or laptop to the laser system.
32 +1. Switch on the laser system.
33 +1. If the blue Acknowledge button is illuminated, press it once.
34 +1. Start the marking software configured for the system - Never start laser marking software before turning on the laser system.
35 +1. Wait for the software to connect to the laser automatically.
36 +1. Confirm that the green system-ready LED is illuminated continuously.
37 +1. Confirm that the two red positioned-laser points are visible.
38 +
39 +The High-Light is now ready for job preparation.
40 +
41 +
42 += Prepare the Marking Job =
43 +
44 +1. Perform the reference run required by the installed axis configuration.
45 +The standard High-Light configuration includes software-controlled X,Y and Z axes. Complete all reference movements requested by the control software before positioning the workpiece.
46 +1. Create a new marking file or open an approved existing file.
47 +1. Load the validated marking parameters for the workpiece material and required marking result.
48 +1. Set the Z-axis to the required focal height.
49 +1. Secure the workpiece in the appropriate fixture.
50 +1. Use the pilot laser to display the marking area or marking contours.
51 +1. Check that the marking is correctly positioned on the workpiece.
52 +1. Where the marking program uses X- and Y-axis movement, verify that the programmed axis positions and travel area are suitable for the installed fixture and workpiece.
53 +
54 +Do not start the marking process until the workpiece is securely positioned and the marking location has been verified.
55 +
56 +
57 += Run the Marking =
58 +
59 +1. Switch on the extraction system.
60 +1. Close the cabin door completely.
61 +1. Confirm that the yellow LED is illuminated. This indicated that the door safely circuit is satisfied.
62 +1. Check the marking software for active warnings or fault messages.
63 +1. Start the marking process.
64 +1. During the marking, the red laser-active LED should be illuminated.
65 +1. The programmed marking sequence runs automatically.
66 +1. Monitor the system during operation. Do not leave High-Light unattended.
67 +1. When the marking process is complete, the red LED switches off while the yellow LED remains illuminated.
68 +1. Open the lifting door using the normal machine controls and remove the marked workpiece.
69 +
70 +(% class="box warningmessage" %)
71 +(((
72 +Never open the cabin or attempt to access the work are while the red laser-active LED is illuminated.
73 +)))
74 +
75 +
76 +
77 += / =