1.1 | 1 | **Description**: Learn how to bring the Schilling High-Light laser marking workstation into operation safely after installation or transport. |
| 2 | |||
| 3 | ---- | ||
| 4 | |||
| 5 | (% class="box warningmessage" %) | ||
| 6 | ((( | ||
| |
1.3 | 7 | **Only qualified personnel may commission the system. Observe all safety notes before switching on. |
| 8 | Important: Remove the protective cap from the laser objective before starting the laser.** | ||
| |
1.2 | 9 | ))) |
| 10 | |||
| |
1.3 | 11 | = Preconditions = |
| 12 | |||
| |
1.4 | 13 | Confirm the following before applying power: |
| 14 | |||
| |
1.6 | 15 | * All packaging material has been removed. |
| 16 | * All transport locks have been removed. | ||
| 17 | * The High-Light is standing upright in its intended operation position. | ||
| 18 | * Supply voltage and frequency have been checked against the machine requirements. | ||
| 19 | * The mains cable and plug are undamaged. | ||
| 20 | * The main switch is in the OFF position before connecting the power cable. | ||
| 21 | * The laser protection window is undamaged. | ||
| 22 | * Optical components are free from dust and contamination. | ||
| |
1.7 | 23 | * The protective cover has been removed from the focusing objective. |
| 24 | * All required laser-safety measures have been implemented and verified. | ||
| 25 | |||
| 26 | The operating environments must also meet the High-Light requirements: | ||
| 27 | |||
| 28 | * Ambient temperature: +15 °C to +35 °C. | ||
| 29 | * Relative humidity: maximum 90%, non condensing. | ||
| 30 | * If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning. | ||
| 31 | * Avoid shocks, vibration and other mechanical stress. | ||
| 32 | * Keep the |