Description: Learn how to bring the Schilling High-Light laser marking workstation into operation safely after installation or transport.
Preconditions
Confirm the following before applying power:
- All packaging material has been removed
- All transport locks have been removed
- The High-Light is standing upright in its intended operation position
- Supply voltage and frequency have been checked against the machine requirements
- The mains cable and plug are undamaged
- The main switch is in the OFF position before connecting the power cable
- The laser procytec