Änderungen von Dokument Commissioning and First Start-Up

Zuletzt geändert von jadomatis am 2026/08/31 10:15

Von Version 3.1
bearbeitet von jadomatis
am 2026/08/31 09:15
Änderungskommentar: Es gibt keinen Kommentar für diese Version
Auf Version 4.1
bearbeitet von jadomatis
am 2026/08/31 09:17
Änderungskommentar: Es gibt keinen Kommentar für diese Version

Zusammenfassung

Details

Seiteneigenschaften
Inhalt
... ... @@ -8,7 +8,7 @@
8 8  Important: Remove the protective cap from the laser objective before starting the laser.**
9 9  )))
10 10  
11 -= Preconditions(Before Switching On) =
11 += Preconditions(Before Switching On) =
12 12  
13 13  Confirm the following before applying power:
14 14  
... ... @@ -48,7 +48,7 @@
48 48  
49 49  = Software and Device Connection =
50 50  
51 -1. Start** AnyMarker Designer** on the control PC.
51 +1. Start** AnyMarker Designer** on the control PC.
52 52  1. Establish communication with High-Light controller.
53 53  1. Verify that the machine is connected and that no active fault prevents operation.
54 54  1. Confirm that the positioning/focus laser is available. During the startup sequence, two red laser points become visible once the system has initialized successfully.
... ... @@ -75,7 +75,7 @@
75 75  
76 76  Unlike the Multi-Light commissioning workflow, the High-Light requires a Z-axis reference run before normal operation.
77 77  
78 -1. Perform a** reference movement of the Z-axis**.
78 +1. Perform a** reference movement of the Z-axis**.
79 79  1. Create or open the required marking file.
80 80  1. Move the Z-axis to the required focusing height for the workpiece.
81 81  1. Verify the focus position before marking
... ... @@ -135,7 +135,7 @@
135 135  
136 136  (% class="box infomessage" %)
137 137  (((
138 -If the marking is too weak, we recommend checking the **Z-position in the job**, the** Z-position in the axis controls**, performing a new **Z-axis reference run and focusing and verifying the marking parameters**.
138 +If the marking is too weak, we recommend checking the **Z-position in the job**, the** Z-position in the axis controls**, performing a new **Z-axis reference run and focusing and verifying the marking parameters**.
139 139  )))
140 140  
141 141  **Also confirm that**:
... ... @@ -166,7 +166,7 @@
166 166  
167 167  (% class="box infomessage" %)
168 168  (((
169 -The High-Light includes software-controlled** X~/~/Y/Z axes**, with approximately **300 mm Z-axis travel** and approximately **460 x 260 mm X/Y travel**, so operators should understand axis movement and ensure that fixtures and workpieces cannot obstruct the required travel.
169 +The High-Light includes software-controlled** X~/~/Y/Z axes**, with approximately **300 mm Z-axis travel** and approximately **460 x 260 mm X/Y travel**, so operators should understand axis movement and ensure that fixtures and workpieces cannot obstruct the required travel.
170 170  )))
171 171  
172 172  
... ... @@ -175,7 +175,7 @@
175 175  
176 176  1. Finish the current marking operation.
177 177  1. Save the required marking project or parameters.
178 -1. Close** AnyMarker Designer** on the PC.
178 +1. Close** AnyMarker Designer** on the PC.
179 179  1. Switch the High-Light off using the **main switch**.
180 180  1. Shut down the extraction system according to its operating instructions.
181 181  1. Leave the work chamber and surrounding area clean.