... ... @@ -4,29 +4,7 @@
4 4  
5 5  (% class="box warningmessage" %)
6 6  (((
7 -**Only qualified personnel may commission the system. Observe all safety notes before switching on.
8 -Important: Remove the protective cap from the laser objective before starting the laser.**
7 +**Only qualified personnel may commission the system. Observe all safety notes before switching on.**
9 9  )))
10 10  
11 -= Preconditions =
12 -
13 -Confirm the following before applying power:
14 -
15 -* All packaging material has been removed.
16 -* All transport locks have been removed.
17 -* The High-Light is standing upright in its intended operation position.
18 -* Supply voltage and frequency have been checked against the machine requirements.
19 -* The mains cable and plug are undamaged.
20 -* The main switch is in the OFF position before connecting the power cable.
21 -* The laser protection window is undamaged.
22 -* Optical components are free from dust and contamination.
23 -* The protective cover has been removed from the focusing objective.
24 -* All required laser-safety measures have been implemented and verified.
25 -
26 -The operating environments must also meet the High-Light requirements:
27 -
28 -* Ambient temperature: +15 °C to +35 °C.
29 -* Relative humidity: maximum 90%, non condensing.
30 -* If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning.
31 -* Avoid shocks, vibration and other mechanical stress.
32 -* Keep the
10 +