Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2026/08/31 10:15
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -8,7 +8,7 @@ 8 8 Important: Remove the protective cap from the laser objective before starting the laser.** 9 9 ))) 10 10 11 -= Preconditions = 11 += Preconditions(Before Switching On) = 12 12 13 13 Confirm the following before applying power: 14 14 ... ... @@ -29,4 +29,20 @@ 29 29 * Relative humidity: maximum 90%, non condensing. 30 30 * If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning. 31 31 * Avoid shocks, vibration and other mechanical stress. 32 -* Keep the 32 +* Keep the ventilation openings and filter areas of both 19" units unobstructed to prevent heat build-up. 33 + 34 +Suitable extraction must be available for the marking process. Laser processing can generate gases, vapors, aerosols and dust depending on the material and parameters. The operator is responsible for providing appropriate extraction to protect personnel, the environment and the working optics. 35 + 36 += Electrical Start-Up = 37 + 38 +1. Verify that the High-Light has been installed correctly and that the main switch is OFF. 39 +1. Connect the machine to the specified electrical supply. 40 +1. Ensure that the required extraction system is available and ready for operatoon. 41 +1. Open the cabin door. 42 +1. Connect the control PC/laptop to the laser and switch on the laser system. 43 +1. If the blue Acknowledge button is illuminated, press it once. 44 +1. After successful acknowledgement and communication with the controller, the green status LED remains illuminated. 45 + 46 += Software and Device Connection = 47 + 48 +