Seiteneigenschaften
Inhalt
... ... @@ -10,14 +10,4 @@
10 10  
11 11  = Preconditions =
12 12  
13 -Confirm the following before applying power:
14 -
15 -* All packaging material has been removed.
16 -* All transport locks have been removed.
17 -* The High-Light is standing upright in its intended operation position.
18 -* Supply voltage and frequency have been checked against the machine requirements.
19 -* The mains cable and plug are undamaged.
20 -* The main switch is in the OFF position before connecting the power cable.
21 -* The laser protection window is undamaged.
22 -* Optical components are free from dust and contamination.
23 -* The protective cover has been removed from the focusing objectiv
13 +Confirm the following