Änderungen von Dokument Commissioning and First Start-Up
Zuletzt geändert von jadomatis am 2026/08/31 10:15
Zusammenfassung
-
Seiteneigenschaften (1 geändert, 0 hinzugefügt, 0 gelöscht)
Details
- Seiteneigenschaften
-
- Inhalt
-
... ... @@ -10,14 +10,4 @@ 10 10 11 11 = Preconditions = 12 12 13 -Confirm the following before applying power: 14 - 15 -* All packaging material has been removed. 16 -* All transport locks have been removed. 17 -* The High-Light is standing upright in its intended operation position. 18 -* Supply voltage and frequency have been checked against the machine requirements. 19 -* The mains cable and plug are undamaged. 20 -* The main switch is in the OFF position before connecting the power cable. 21 -* The laser protection window is undamaged. 22 -* Optical components are free from dust and contamination. 23 -* The protective cover has been removed from the focusing objectiv 13 +Confirm the following