Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2026/08/31 10:15
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -4,20 +4,7 @@ 4 4 5 5 (% class="box warningmessage" %) 6 6 ((( 7 -**Only qualified personnel may commission the system. Observe all safety notes before switching on. 8 -Important: Remove the protective cap from the laser objective before starting the laser.** 7 +**Only qualified personnel may commission the system. Observe all safety notes before switching on.** 9 9 ))) 10 10 11 -= Preconditions = 12 - 13 -Confirm the following before applying power: 14 - 15 -* All packaging material has been removed. 16 -* All transport locks have been removed. 17 -* The High-Light is standing upright in its intended operation position. 18 -* Supply voltage and frequency have been checked against the machine requirements. 19 -* The mains cable and plug are undamaged. 20 -* The main switch is in the OFF position before connecting the power cable. 21 -* The laser protection window is undamaged. 22 -* Optical components are free from dust and contamination. 23 -* The protective cover has been removed from the focusing objectiv 10 +