Changes for page Commissioning and First Start-Up
Last modified by jadomatis on 2026/08/31 10:15
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -12,7 +12,21 @@ 12 12 13 13 Confirm the following before applying power: 14 14 15 -* All packaging material has been removed 16 -* All transport locks have been removed 17 -* The High-Light is standing upright in its intended operation position 18 -* Supply voltage and frequen 15 +* All packaging material has been removed. 16 +* All transport locks have been removed. 17 +* The High-Light is standing upright in its intended operation position. 18 +* Supply voltage and frequency have been checked against the machine requirements. 19 +* The mains cable and plug are undamaged. 20 +* The main switch is in the OFF position before connecting the power cable. 21 +* The laser protection window is undamaged. 22 +* Optical components are free from dust and contamination. 23 +* The protective cover has been removed from the focusing objective. 24 +* All required laser-safety measures have been implemented and verified. 25 + 26 +The operating environments must also meet the High-Light requirements: 27 + 28 +* Ambient temperature: +15 °C to +35 °C. 29 +* Relative humidity: maximum 90%, non condensing. 30 +* If the system has experienced significant temperature changes during transport, allow it to return to room temperature before commissioning. 31 +* Avoid shocks, vibration and other mechanical stress. 32 +* Keep the